Laserfiche WebLink
Re: Use of Windsor Properties $1 Million Donation <br />PARKS AND RECREATION PROJECT LIST <br />ESTIMATED <br />ANNUAL <br />PRIORITY # <br />DESCRIPTION <br />COST <br />MAINTENANCE <br />COMMENTS <br />1 <br />58th Avenue Ballfield Renovation and Expansion Project <br />This project updates and preserves the two existing youth <br />$800,000 <br />$15,000 - $20,000 <br />*The existing facility is already <br />dimension fields, while adding one high school dimension <br />maintained by the Parks Division. <br />baseball field. It also includes a restroom/ concession <br />Additional costs include materials <br />building to be located in the most centralized and practicable <br />and equipment. Additional duties <br />area. Proceeds from the sale of the 16th Street Ballfields <br />will be absorbed from the manpower <br />could be used to defray the cost of this project. <br />presently allocated to the 16th <br />Street Ball Field Complex. <br />2 <br />58th Avenue Ballfield Renovation <br />This project upgrades one of the existing fields by adding a <br />$475,000 <br />$5,000 <br />*The existing facility is already <br />grass infield, lighting and irrigation. Upgrades to the second <br />maintained by the Parks Division. <br />field include a grass infield, and relocating lights and fencing <br />Additional costs include materials <br />to create one high school dimension field. Proceeds from the <br />and equipment. Additional duties <br />sale of the 16th Street Ballfields could be used to defray the <br />will be absorbed from the manpower <br />cost of this project. <br />presently allocated to the 16th <br />Street Ball Field Complex. <br />3 <br />Round Island Riverside Park Kayak Launch <br />This project would create a new kayak launching area south of <br />$60,000 <br />$2,500 <br />*The existing facility is already <br />the boat ramp which would alleviate congestion in the boat <br />maintained by the Parks Division. <br />ramp area. <br />Additional costs include <br />maintenance and repair. <br />4 <br />Pickle Ball Courts <br />The game of Pickle Ball is a growing sport among Youth and <br />$320,000 <br />Construction would be by a <br />Seniors. There is a shortage of courts for this game. We are <br />contractor with tennis court <br />requesting to build eight pickle ball courts. This would <br />experience. We would look at type <br />translate into the size of two tennis courts. These can be <br />of surface, perimeter fencing, <br />constructed in open space in Richard "Dick" Bird / South <br />windscreens, seating, netting and <br />County Regional Park. <br />drainage. <br />$3,000 <br />Yearly cost for striping <br />$10,000 Five year cost for re- <br />surfacing <br />5 <br />West Wabasso Park Infield Renovation <br />This project rebuilds the infield at West Wabasso Park to <br />$50,000 <br />$5,000 <br />The existing facility is already <br />include laser grading for final elevation and proper drainage, <br />maintained by the Parks Division. <br />new hybrid Bermuda grass for the infield and renovates the <br />The field would be utilized much <br />irrigation system. <br />more with these upgrades. <br />6 <br />Kiwanis Hobart Restroom Renovation & Playground <br />Replace existing restrooms near pavilions and replace the <br />$225,000 <br />$0 <br />The existing facility is already <br />aged playground equipment <br />maintained by the Parks Division. <br />These upgrades would not create <br />any additional maintenance costs. <br />7 <br />Eight Lane Track <br />Gifford Park Football/ Soccer Field was designed with a track <br />$560,000 <br />$3,000 <br />Yearly cost - striping and repair; <br />around it. The lights were set back to accommodate the eight <br />$10,000 is the five year cost for <br />lane track. <br />resurfacing. <br />Total <br />1 <br />$2,490,000 <br />$33,500- $38,500 <br />P102 <br />