My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />DATE OF ISSUANCE: 9/24/15 <br />No. 01 <br />EFFECTIVE DATE: 9/24/15 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design <br />Project: Gifford Neighborhood 4511' Street Beautification Project <br />OWNER'S Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Raise existing inlet at station 197+45 north to accommodate construction of 5 -foot paved <br />shoulders using an 8 -inch precast concrete collar and new pedestrian friendly grate. <br />Purpose of Work Change Directive: <br />Existing drainage structure at station 197+45 north is low and will present a safety hazard to the <br />public if not addressed as part of the 5 -foot paved shoulder widening. <br />Attachments: Sunshine Land Design Proposal dated 9/17/15 for an Inlet Adjustment and Collar <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />0 Unit Prices <br />X Lump Sum <br />0 Other: <br />0 By Change Order: <br />Method of determining change in <br />Contract Times <br />[� Contractor's Records <br />II Engineer's Records <br />II Other: <br />n By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$2,237,33 Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated If the change Involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: RECOMMENDED: APPROVED: <br />Richard Sz rka E. y d8-6Z,,1 <br />B B � :B <br />5l/ — 1 I Date: 9/24/15 1 1'Date: 71zl1/S <br />*"END OF SECTION"" <br />F:\Pubtic Works\ENGINEERING DIVISION PROJECTS\1506-Gifford Neighborhood 45th St BeautificationlOeslgn\Work Change <br />Directives\WCD #111506 - 45th Street Beautification Project WCD #109241 5.doc <br />P41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.