My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 03 <br />DATE OF ISSUANCE: 3/3/2015 <br />EFFECTIVE DATE: 313/15 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design <br />Project: Gifford Neighborhood 45th Street Beautification Project <br />OWNER'S Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Remove and replace unforeseen deteriorated storm culvert at Station 173+21. <br />Purpose of Work Change .Directive: <br />Replacement of deteriorated 18" stormwater culvert and installation of a headwall at the above <br />location to accommodate the new sidewalk. <br />Attachments: Sunshine Land Design Proposal — Change Order Request #05 Dated 2/24/16 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />II Unit Prices <br />X Lump Sum <br />II Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />L] Contractor's Records <br />II Engineer's Records <br />II Other <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$8.314.10 Substantial Completion: 0 days; <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />, <br />By <br />By har . pSp: rka E.By <br />. <br />CONTRACT (Sign ture) <br />ENGIN ER (Signat re) <br />OWNER (Signature) <br />' <br />3/r/h <br />Date: <br />Date: 3/3116 <br />Date: <br />* * END OF SECTION * * <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1506-Gifford Neighborhood 46th St Beauti icatlonMesign\Work Change <br />Directives\WCD #31506 - 45th Street Beautification Project WCD #3 030316.doc <br />P45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.