My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ I <br />SECTION 00948 -Work Change Directive <br />No. 04 <br />DATE OF ISSUANCE: 4/29/2016 EFFECTIVE DATE: 4/29/2016 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design <br />Project: Gifford Neighborhood 451h Street Beautification Proiect <br />OWNER's Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Remove unforeseen buried concrete in various locations. <br />Purpose of Work Change Directive: it <br />Remove unforeseen buried concrete affecting the construction of the project. <br />Attachments: Sunshine Land Design Proposal #7 — Dated 4/15/16 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />F1 Unit Prices <br />X Lump Sum <br />❑ 'Other: <br />j] By Change Order: <br />Estimated increase (decrease) of this Work <br />Change Directive <br />$4.706.00 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in <br />Contract Times <br />[j Contractor's Records <br />❑ Engineer's Records <br />[l Other: <br />C1 By Change Order. <br />Estimated increase (decrease) in Contract Times: <br />Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACC PT/E�D:' RECOMMENDED: APPROVED: <br />B Richard ar. S�p� ka�P.E. gy AA <br />(Signature) <br />Date: 412, 9 f ( lv I I Date: 4/29/16 1 1 Date: ? <br />* * END OF SECTION * * <br />FAPub11c WorksIENGINEERING DIVISION PROJECTS11506-Gifford Neighborhood 45th St Beautification0esignlWork Change <br />Directives\WCD #41506 - 45th Street Beautification Project WCD #4 042916.doc <br />I' <br />,I <br />P47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.