My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 06 <br />DATE OF ISSUANCE: 6/15/16 EFFECTIVE DATE: 6/15/16 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design, Inc. <br />Project: Gifford Neighborhood 45"' Street Beautification Project <br />OWNER's Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Modification to existing pavement cross slopes (existing condition) to facilitate drainage from <br />the roadway at the 281' Court side street connection to 45th Street. <br />Purpose of Work -Change Directive: <br />Mitigate an existing pavement drainage condition and harmonize the existing project with <br />the right-of-way limits and connecting existing roadways. The existing crown configuration <br />along with adjacent right-of-way conditions at 28TM Court would have prevented sheet flow <br />from the roadway creating ponding and a subsequent maintenance condition. This required <br />additional profile milling to ensure adequate drainage could be established. <br />Attachments: (List documents supporting change) <br />Sunshine Land Design Proposal #09 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />0 Unit Prices <br />IR Lump Sum <br />0 Other. <br />0 By Change Order: <br />Method of determining change in <br />Contract Times <br />❑ Contractor's Records <br />E] Engineer's Records <br />0 Other:0-days, no impact to schedule <br />II By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$1.290.00 Substantial Completion: 0 days; <br />If the change Involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Ready for Final Completion:.0 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without Further <br />authorization. <br />ACCE TED: <br />RECOMMENDED: <br />APPROVED: <br />By. <br />By: Z <br />By: <br />CONTRACTOR (Si ature) <br />ENG ER (Signatur <br />OWNER Signatu ) <br />Date: 1(e I tQ <br />Date: S t 4 <br />Date: 6 Z Z G 6 <br />RNPublic Works\ENGINEERING DIVISION PROJECTS11506-Gifford Neighborhood 45th St Beauti icatlon%Admin\Work Change <br />DirectivesMCD-06 28th Ct road profliing\IRC-1506 WCD-06_Roadway Grading 28th Ct.doo <br />P51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.