My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 07 <br />DATE OF ISSUANCE: 6/15/16 EFFECTIVE DATE:6/15/16 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design, Inc. <br />Project: Gifford Neighborhood 451 Street Beautification Project <br />OWNER's Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Modify side swale drainage (existing condition) to facilitate drainage from the roadway at the <br />28th Court side street connection to 45th Street. The substandard drainage conditions were <br />witnessed by IRC staff during the walkthrough punch list inspection of the project on 6/9116. <br />Purpose of Work Change Directive: <br />Mitigate an existing drainage condition and harmonize the existing project with the right-of- <br />way limits. <br />Attachments: (List documents supporting change) <br />Sunshine Land Design Proposal -410 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />II Unit Prices <br />Lump Sum <br />II Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />II Contractor's Records <br />17 Engineer's Records <br />Other.0-days, no impact to schedule <br />II By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$180.00 Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACC <br />By: <br />Date: b //V <br />By: <br />Date: 6PSI A O <br />APPROVED: <br />By: <br />Date: C/2Z116 <br />F:1Public WorksIENGINEERING DIVISION PROJECTS\1606-Gifford Neighborhood 46th St BeautiflcationWdmin\Work Change <br />DlrectiveslWCD-07 regrading at 28th GAIRC-1806_WCD-07 Drainage Modification 28th Ct.doc <br />P53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.