My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 09 <br />DATE OF ISSUANCE: 7/5/16 <br />EFFECTIVE DATE: 7/5/16 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design, Inc. <br />Project: Gifford Neighborhood 451 Street Beautification Project <br />OWNER's Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Remove additional concrete and f -curb that was not reflected in the original plan set / bid <br />documents. <br />Purpose of Work Change Directive: <br />Removal/demolition of areas not reflected under the original plans in order to tie work within <br />the Indian River County right of way into the planned project work. <br />Attachments: (List documents supporting change) <br />Sunshine Land Design Proposal #08 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim. for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />0 Unit Prices <br />0 Lump Sum <br />0 Other: <br />0. By Change Order: <br />Method of determining change in <br />Contract Times <br />0 Contractor's Records <br />0 Engineer's Records <br />0 Other.0-days, no impact to schedule <br />0 By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$7.035.60 Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACC PTSD: <br />RECOMMENDED: <br />APPROVED: <br />James W. nis, PE <br />�.��� <br />IM4 <br />By. <br />By <br />By: <br />CONTRA(50R (Si nature) <br />EN EER (Signature) <br />-OWNER (Signature) <br />Date: L! <br />?j6J711 <br />Date: % Ic K <br />F\Public Works\ENGINEERING DIVISION PROJECTS\1506-Gifford Neighborhood 45th St BeautiftcationlAdmin\Work Change <br />Directives\WCD-08 Curb RemovalURC-1506 WCD-09 Curb Removal.doc <br />P57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.