My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i' <br />SECTION 00848 - Want Change Directive <br />A No. 10 <br />DATE OF ISSUANCE: 9/20/16 EFFECTIVE DATE: 9/20/16 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design, Inc. <br />Project: Gifford Neighborhood 45th Street Beautification Project <br />OWNER's Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: j <br />Additional Bond Costs & Additional RR Thermoplastic Message Installation. <br />Purpose of Work Change Directive: <br />Compensation for additional bond costs related to Work added to Contract by change orders <br />and work change directives. <br />i <br />Attachments: (List documents supporting change) <br />Sunshine Land Design Proposal #12 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />Unit Prices <br />L], !:1 Contractor's Records <br />1K Lump Sum 12 Engineer's Records <br />E. Other: 0 Other:0-dWs. no impact to schedule <br />Q By Change Order: ❑. By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$12.161.96 Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. guthorization. <br />ACCEPTED: RECOMMENDED: APPROVED: <br />James W. nis, PE <br />B By: <br />euv <br />CONTRACT (Sig ature) EN ER (Signature) OWNER (Sign to <br />/ <br />Date: q (a f I I LP Date: q�/< < Date: �/ /?-l1/ <br />F:1Public Works\ENGINEERING DIVISION PROJECTS11606-Gifford Neighborhood 45th St BeautiflcationWdminlWork Change <br />DlrectivesUCD-10_RR Message & Bond11RC-1509 WCD-09 Bond & RR.doc <br />.I <br />P59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.