Consultant will attend a kick-off meeting to discuss the operation of the existing treatment <br />system since the previous permit renewal, collect data, and discuss potential revisions to <br />the permit through the application renewal. Consultant will conduct a site visit with <br />operations staff to review the operation of the existing Spoonbill Marsh and stormwater <br />pump station, and attend a pre-application/site meeting with FDEP staff as suggested in <br />their notice of permit renewal. <br />Consultant will prepare applicable applications and supporting information to maintain the <br />existing rated capacity. Application forms including 62-620.910(1) and 2DC 62- <br />620.910(18) forms will be prepared and submitted along with supporting tables, graphs, <br />and process flow diagram. <br />Consultant will prepare a list of data and documentation needed for the preparation of the <br />permit renewal application. Information such as background water quality data, treatment <br />plant water quality, MOR's, daily plant flow data, non-compliance notices, historical <br />concentrate water characteristic data, etc., as a minimum, will be provided by IRCU for use <br />in preparing the permit application. <br />The following parameters are included as part of the existing operating permit and will be <br />reviewed as part of the permit application. Almost all of these parameters are measured at <br />the effluent location (EFF -003) of the treatment system. Where practical and if desired, <br />the frequency and/or elimination of testing will be requested in the permitting process. <br />• Flow Chlorine <br />• pH Phosphorus (Total) <br />• Ortho -phosphorus Nitrogen (Total) <br />• Chromium, Hex (Cr6) Ammonia Nitrogen <br />• Copper Iron <br />• Hydrogen Sulfide Gross Alpha <br />• Dissolved Oxygen Radium 226/228 <br />• Conductivity (Salinity) Turbidity <br />• Chronic Whole Effluent Toxicity — Mysid Shrimp (Americamysis (Mysidopsis) <br />bahia) <br />• Chronic Whole Effluent Toxicity — Silverside (Menidia beryllina) <br />Consultant will rely on the calculations for Total Daily Mass Load (TMDL) and Spoonbill <br />Marsh system performance as outlined in the permit. <br />Consultant will prepare a draft application with supporting tables, graphs, trends, and <br />explanations to the permit application renewal and submit draft copies to IRCU staff for <br />review one month prior to submittal deadline. Consultant will attend a review meeting to <br />discuss the draft application and supporting information, and revise the permit application <br />based on comments developed in review meeting. <br />P154 <br />