My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/10/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
01/10/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2017 3:48:32 PM
Creation date
2/21/2017 1:38:05 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/10/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 2 - FINANCIAL ASSURANCE <br />The COUNTY operates a Class I and construction and demolition (C&D) debris landfills through a <br />contract with Republic Services. The COUNTY is required by Chapter 62-701, F.A.C. to provide <br />financial assurance for each of these facilities annually. <br />Subtask 2.1- Recalculation of the Closure Cost Estimates <br />CONSULTANT will prepare a recalculation of the estimated closing and long-term care costs for the <br />Class I and C&D debris landfill. CONSULTANT will use the recalculated closing and long-term care <br />cost estimates to complete the Closure Cost Estimating Form for Solid Waste Facilities for the both <br />the Class I landfill (includes the waste tire site) and the C&D debris landfill. The forms will be <br />submitted for review by the COUNTY prior to submittal to FDEP. <br />Subtask 2.2 - Survey and Airspace Assessment <br />CONSULTANT will provide surveys and assessments of consumed airspace performed by, a <br />subconsultant, Masteller, Moler & Taylor, Inc. for the Class I and C&D debris landfills. The survey <br />work for the Class I waste area will include a complete topographic survey of Segments I, II, and III <br />as well as the ditches and roadways surrounding the Class I area. The topographic survey of the <br />C&D debris landfill site will include the waste area, as well as the fence -line and the surrounding <br />ditches and berms adjacent to the C&D debris site. CONSULTANT will review the volumetric <br />modeling and include a summary of estimated waste density based on the results of the survey and <br />volumetric modeling. <br />The deliverable from Masteller, Moler & Taylor, Inc. will consist of a survey identifying the dates the <br />field survey was completed. Airspace consumed and remaining airspace based on the survey and <br />the construction and design criteria shall be specifically identified in the financial assurance report. <br />The survey shall also include the results of the volumetric calculations for the Segments II and III <br />portions of the Class I landfill, as well as the C&D debris landfill. Deliverables accompanying the <br />survey shall include: <br />A 1 -inch = 50 feet scale contour map for each site with 1 -foot contour intervals in regular weight <br />lines, and 5 -foot contour intervals in bold weight lines. Signed and sealed contour maps will be <br />provided on 24 -inch by 36 -inch paper of each landfill site in 1 -inch = 200 feet scale. A Compact Disc <br />(CD) with ASCII file of the survey data in AutoCAD 2010 will also be provided. <br />For the Class I Landfill (Segments I, II, and III), the financial assurance report shall include an <br />evaluation of the compaction of the waste and an analysis as to whether Republic Services is <br />meeting its contractual compaction requirements. CONSULTANT will include escrow account <br />balance recommendations for Fiscal Year 2016-2017, as well as escrow account budget <br />recommendations for Fiscal Year 2017-2018. <br />Subtask 2.3 - Financial Assurance Report <br />CONSULTANT will prepare documentation that demonstrates proof of financial assurance for the <br />cost of closing and providing long-term care for the Class I landfill, the C&D debris landfill, and the <br />waste tire site. This documentation will be submitted for review by the COUNTY. Two copies of the <br />final document will be provided to the COUNTY. CONSULTANT will meet with the COUNTY up to <br />two times to discuss issues and to provide needed coordination. CONSULTANT will also respond to <br />FDEP correspondence regarding financial assurance. <br />A-2 <br />jj1950.docx <br />P221 <br />
The URL can be used to link to this page
Your browser does not support the video tag.