Laserfiche WebLink
make. The Contractor shall, within sixty (60) days of receipt of the Alteration <br /> Notification, alter the services provided to such CCC (the "Affected CCC") as directed <br /> by SWDD in the Alteration Notification. Subsequent to alteration of the services <br /> provided to the Affected CCC, the Contractor will provide SWDD with information <br /> identifying cost savings and cost increases for the Affected CCC, as well as cost savings <br /> and cost increases for any other CCCs caused by the SWDD-directed alteration of <br /> services provided to the Affected CCC based on a comparison of the immediate six (6) <br /> months prior to the alteration of the services and the subsequent six (6) months after the <br /> alteration of the services. The Contractor will identify the Affected CCCs and will <br /> provide the SWDD with a formula for the calculation of these savings and and/or <br /> increases. The example formula attached hereto as Schedule 5 identifies factors which <br /> may be considered and includes an example of a calculation method which may be used <br /> to determine pricing related to any such alteration of the Affected CCCs. The Contractor <br /> will pass through to SWDD fixed and variable cost savings resulting from the SWDD- <br /> directed alteration of Affected CCCs. For purposes of clarity, to the extent that any <br /> materials are diverted from an Affected CCC to a non-Affected CCC, any cost increases <br /> to the Contractor related to such diversion shall reduce the cost savings to SWDD. <br /> 6. Other Revisions to Contract. The parties acknowledge that recycling services are and <br /> shall continue to be provided on a single-stream basis. <br /> 7. Ratification. Except as specifically provided in this Ninth Amendment, all other <br /> provisions of the Contract shall remain in full force and effect. <br /> [signature page follows] <br /> l OG22 7O <br /> Ninth Amendment to Contract Page 3 o f 5 <br />