D CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all
<br /> additional or supplementary examinations, investigations, explorations, tests, studies, and data
<br /> concerning conditions(surface, subsurface, and Underground Facilities)at or contiguous to the Site
<br /> which may affect cost, progress, or performance of the Work or which relate to any aspect of the
<br /> means, methods, techniques, sequences, and procedures of construction to be employed by
<br /> CONTRACTOR, including applying the specific means, methods, techniques, sequences, and
<br /> procedures of construction, if any, expressly required by the Contract Documents to be employed
<br /> by CONTRACTOR, and safety precautions and programs incident thereto.
<br /> E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests,
<br /> studies, or data are necessary for the performance of the Work at the Contract Price, within the
<br /> Contract Times,and in accordance with the other terms and conditions of the Contract Documents.
<br /> F CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the
<br /> Site that relates to the Work as indicated in the Contract Documents
<br /> G. CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br /> observations obtained from visits to the Site, reports and drawings identified in the Contract
<br /> Documents, and all additional examinations, investigations, explorations, tests, studies, and data
<br /> with the Contract Documents
<br /> H CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies
<br /> that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof
<br /> by OWNER is acceptable to CONTRACTOR
<br /> I The Contract Documents are generally sufficient to indicate and convey understanding of all terms
<br /> and conditions for performance and furnishing of the Work.
<br /> ARTICLE 8-CONTRACT DOCUMENTS
<br /> 8.01 Contents
<br /> A. The Contract Documents consist of the following
<br /> 1. This Agreement(pages 1 to 7 of 7, inclusive),
<br /> 2. Notice to Proceed
<br /> 3. Public Construction Bond (pages_to_, inclusive),
<br /> 4. Certificate of Liability Insurance
<br /> 5. Irrigation System Material and Installation Specifications(pages 1 to 44, inclusive)
<br /> 6. Drawings consisting of a cover sheet and sheets numbered OVR, M1 to M2, ELI, EL2, D1, D2,
<br /> with each sheet bearing the following general title Sandridge Golf Course-Lakes Course,
<br /> 7. Addenda (numbers 1 to 3, inclusive),
<br /> Page 4 of 7