Laserfiche WebLink
D CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br /> additional or supplementary examinations, investigations, explorations, tests, studies, and data <br /> concerning conditions(surface, subsurface, and Underground Facilities)at or contiguous to the Site <br /> which may affect cost, progress, or performance of the Work or which relate to any aspect of the <br /> means, methods, techniques, sequences, and procedures of construction to be employed by <br /> CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br /> procedures of construction, if any, expressly required by the Contract Documents to be employed <br /> by CONTRACTOR, and safety precautions and programs incident thereto. <br /> E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br /> studies, or data are necessary for the performance of the Work at the Contract Price, within the <br /> Contract Times,and in accordance with the other terms and conditions of the Contract Documents. <br /> F CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the <br /> Site that relates to the Work as indicated in the Contract Documents <br /> G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site, reports and drawings identified in the Contract <br /> Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br /> with the Contract Documents <br /> H CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br /> that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br /> by OWNER is acceptable to CONTRACTOR <br /> I The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br /> and conditions for performance and furnishing of the Work. <br /> ARTICLE 8-CONTRACT DOCUMENTS <br /> 8.01 Contents <br /> A. The Contract Documents consist of the following <br /> 1. This Agreement(pages 1 to 7 of 7, inclusive), <br /> 2. Notice to Proceed <br /> 3. Public Construction Bond (pages_to_, inclusive), <br /> 4. Certificate of Liability Insurance <br /> 5. Irrigation System Material and Installation Specifications(pages 1 to 44, inclusive) <br /> 6. Drawings consisting of a cover sheet and sheets numbered OVR, M1 to M2, ELI, EL2, D1, D2, <br /> with each sheet bearing the following general title Sandridge Golf Course-Lakes Course, <br /> 7. Addenda (numbers 1 to 3, inclusive), <br /> Page 4 of 7 <br />