Laserfiche WebLink
Indian River County Department of Utilities <br /> LABOR AND MATERIAL COST <br /> Project: GRAND HARBOR-St.David's Lane-WATER SERVICE REPLACEMENT PROJECT <br /> Date: January 11,2017 <br /> IF <br /> MATERIAL COSTS(HD <br /> LABOR COSTS Waterworks) <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. Description Quantity Measure Price Price Price Price <br /> 71 Mobilization,Demobilization,MOT 1 10 % $7,376.50 <br /> 23 Test Holes/Potholes 84 EA. $250.00 $21,000.00 <br /> 700 LF $4.80 $3,360.00 2.75 $1,925.00 <br /> 01a Ilnstall 1"or 1-1/2"'pe or PVC Service Line <br /> 300 LF $33.35 $10,005.00 2.00 $600.00 <br /> 07a Install 2-4"HDPE Directional Bore <br /> Install Water Service Single Short with 2"Saddle and 6 EA. $300.00 $1,800.00 300.00 $1,800.00 <br /> 18a Corp Stop at Main <br /> Install Water Service Double Short with 2"Saddle and 9 EA. $350.00 $3,150.00 510.00 $4,590.00 <br /> 18e Corp Stop at Main <br /> Install Water Service Single Long with 2"Saddle and Corp 7 EA. $425.00 $2,975.00 310.00 $2,170.00 <br /> 18g Stop at Main <br /> Install Water Service Double Long with 2"Saddle and 20 EA. $425.00 $8,500.00 570.00 $11,400.00 <br /> 18j Corp Stop at Main <br /> 181 Install 2"service casing 25 EA. $400.00 $10,000.00 2.75 $1,925.00 <br /> Install Asphalt Cement Replacement over full trench <br /> width including Base&Sub-grade Compacted to County 100 TON $45.00 $4,500.00 $75.00 $7,500.00 <br /> 67a Specifications <br /> 86a Lawn Restoration(Topsoil&Sod)up to 12'Wide 100 SY $2.25 $225.00 $2.16 $216.00 <br /> Well Point Dewatering,Each Tier depth up to 25' <br /> 2 EA. $3,500.00 $7,000.00 <br /> 66a (Minimum 30'X 30'Work Area) <br /> 66b Well Points,Additional Points as Needed 50 EA $25.00 $1,250.00 <br /> Subtotal SubtotalWater System Labor $81,141.50 $32,126.00 <br /> Contingency 1 % 10% $8,114.15 20% <br /> $6,425.20 <br /> Subtotal Water System Labor, Mob.,Demob.,MOT, <br /> Subtotal Materials, &Permitting $89,255.65 <br /> $38,551.20 <br /> SubTotal Labor Cost $89,255.65 Materials $38,551.20 <br /> TOTAL COST $127,806.85 <br /> ATTACHMENT 2 <br />