Laserfiche WebLink
in connection with the performance of this Contract. Upon such termination Contractor shall be <br /> entitled to payment only as follows: <br /> (1) The actual cost of the work completed in conformity with this Contract and the <br /> specifications;plus, <br /> (2) Such other costs actually incurred by Contractor as are permitted by the prime contract <br /> and approved by the Owner. <br /> Contractor shall not be entitled to any other claim for compensation or damages against the <br /> County in the event of such termination. <br /> Page 13 <br />