Laserfiche WebLink
D. Contractor shall provide debris processing(includes vehicle receiving/traffic control services and <br /> creation of mulch)and disposal/recycling services for yard waste, landscaping debris,and land <br /> clearing delivered to the Solid Waste Disposal District Indian River County Landfill. <br /> E. Contractor shall process all materials within Federal,State, Local and the Solid Waste Section <br /> guidelines.Any proposed regulations that are adopted by the Regulatory agencies that are more <br /> restrictive than this document shall be incorporated into this Agreement. <br /> F. Contractor,at their own expense,shall market and remove the materials generated by the <br /> processing operation conducted at the landfill in a manner that Indian River County will receive <br /> recycling credits. Remaining post-processing materials on site can never exceed 30 days receipts <br /> of yard waste. <br /> G. The processing specifications for contractor are as follows: <br /> 1. Contractor shall receive and handle all materials on site delivered by customers from 7:00 <br /> a.m.to 5:00 p.m.,seven days per week except for the following holidays: Independence <br /> Day, Labor Day,Thanksgiving,Christmas,and New Year's Day. <br /> 2. Contractor shall inspect all incoming material for conformity to yard waste specifications <br /> (less than 3 inches in diameter).All yard waste not meeting this requirement shall be <br /> reported to the SWDD scalehouse so that appropriate charges are applied. Loads containing <br /> hazardous or unacceptable materials shall be refused if identified prior to being dumped. If <br /> identified after being dumped,then notify scalehouse and provide an opportunity for <br /> customer to remove all non-conforming materials. If identified after customer has left,then <br /> handle hazardous materials appropriately and place all other non-conforming materials in a <br /> roll-off container provided by the landfill contractor.This container will be weighed at the <br /> scalehouse prior to disposal by the landfill contractor.The disposal tonnage will be deducted <br /> from the incoming yard waste materials; however,the disposal charges will not apply. <br /> 3. Contractor shall process all materials on site as needed to allow for a safe working <br /> environment. <br /> 4. Contractor shall prepare and provide a site operating plan as well as a health and safety plan <br /> for approval by SWDD.The plan shall include, at a minimum,site environmental issues such <br /> as noise,dust,odor and waste acceptance as well as equipment and personnel safety issues, <br /> personnel training,site communication,fire prevention and control,management of <br /> contamination and spill response. <br /> 5. Processed material not utilized by the SWDD for landfill cover material or other beneficial <br /> uses will be Contractor's responsibility to market and/or sell and provide all trucking at their <br /> expense. Contractor will provide in writing to the SWDD the final destination(s)of the <br /> material upon contract award. <br /> 6. Contractor shall remove and consolidate any foreign materials(non-wood wastes/non- <br /> process materials) dropped off improperly at the site.The Contractor will haul these foreign <br /> materials;garbage,tires,scrap metals,etc.,and transport them to their proper disposal <br /> locations as directed by the SWDD Scalehouse staff. <br /> 7. If the Contractor's equipment fails to operate for seven (7)consecutive days the Contractor <br /> will utilize alternate equipment to process the material. <br /> Page 2 <br />