My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-036
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2017 2:34:56 PM
Creation date
3/15/2017 2:34:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/14/2017
Control Number
2017-036
Agenda Item Number
8.E.
Entity Name
CB&I Coastal Planning & Engineering
Subject
Dune Repair Project
Area
Sector 3 Project area
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
representations of shoreline (contour) and volumetric changes for the monitoring area will be presented. Summary <br />tables of the shoreline and volumetric changes will be presented. <br />CB&I will collect aerials of the project area as discussed more fully later in this scope of work. The aerials will be <br />collected from R-15 through R-60. Plots of relevant hardbottom and shoreline positions will be overlaid on the <br />aerials and included in the report appendix. Considering biological monitoring is no longer required for this project, <br />delineation of the edge of hardbottom is not required for the aerial photography. <br />Deliverables <br />CB&I will submit a draft of the report of the County for review and comment. This will be submitted electronically <br />(PDF and/or MS Word formats). CB&I will incorporate comments from the County and revise the report <br />accordingly. CB&I will then submit an electronic copy to the FDEP. CB&I will submit one hard copy and an <br />electronic copy (PDF) to the County. <br />Required Data <br />To perform the physical monitoring evaluation, CB&I will need the following data: <br />• Survey data in x,y,z format collected in summer of 2017. <br />Schedule <br />The draft monitoring report will be completed within 60 days of receipt of the survey data. We estimate that the <br />County will review and provide comments on the document within 2 weeks. CB&I will revise the report, <br />incorporate the County's comments, and submit a final report to the County and FDEP within 2 weeks of receipt of <br />the County's comments. The goal is to submit the final report to the FDEP within 90 days of receipt of the required <br />data. Assuming that data is provided by August 31, we estimate submittal of a final report by November 30, 2017. <br />Cost <br />The cost of the monitoring report, excluding the aerial collection is $27,642.00. A breakdown of the hours and <br />expenses to develop these costs is attached and follow the provisions of the Professional Coastal Engineering <br />Services Agreement (dated March 19, 2013) and Contract Renewal (dated March 17, 2015), between Indian River <br />County and CB&I Coastal Planning & Engineering, Inc. <br />Rectified Aerial Photographs <br />Aerial photographs are required per FDEP special permit condition 56(c). CB&I will have aerials collected that <br />follow BBCS Monitoring Standards for Beach Erosion Control Projects, Section 02100 — Environmental Aerial <br />Photography Acquisition. <br />Controlled, flight -dated, color vertical aerial photographs will be taken from Indian River County FDEP range <br />monuments R-15 through R-60, inclusive. Collection of the aerial photography will be timed so as to collect the <br />aerials concurrently with the surveys. CB&I will rely on Indian River County to notify us as to when these surveys <br />are being performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.