Laserfiche WebLink
i <br /> performed by utility owners. If such other work is not 702 Coordination <br /> noted in the Contract Documents, then: <br /> A. If OWNER intends to contract with others for <br /> 1. written notice thereof will be given to the performance of other work on the Project at the <br /> CONTRACTOR prior to starting any such other Site, the following will be set forth in Supplementary <br /> work;,and Conditions: <br /> 2. if OWNER and CONTRACTOR are 1. the individual or entity who will have <br /> unable to agree on entitlement to or on the authority and responsibility for coordination of <br /> amount or extent, if any, of any adjustment in the activities among the various contractors will <br /> the Contract Price or Contract Times that be identified; <br /> should be allowed as a result of such other <br /> work, a Claim may be made therefor as 2. the specific matters to be covered by <br /> provided in paragraph 10.05. such authority and responsibility will be <br /> itemized; and <br /> B. CONTRACTOR shall afford each other <br /> contractor who is a party to such a direct contract and 3. the extent of such authority and <br /> each utility owner (and OWNER, if OWNER is per- responsibilities will be provided. <br /> forming the other work with OWNER's employees) <br /> proper and safe access to the Site and a reasonable B. Unless otherwise provided in the <br /> opportunity for the introduction and storage of Supplementary Conditions, OWNER shall have sole <br /> materials and equipment and the execution of such authority and responsibility for such coordination. <br /> other work and shall properly coordinate the Work with <br /> theirs. Unless otherwise provided in the Contract <br /> Documents, CONTRACTOR shall do all cutting, ARTICLE 8-OWNER'S RESPONSIBILITIES <br /> fitting, and patching of the Work that may be required <br /> to properly connect or otherwise make its several <br /> --parts-come together and properly integrate with-such -- --8.01----Communications to Contractor-­ <br /> other <br /> ontractor—other work. CONTRACTOR shall not endanger any <br /> work of others by cutting, excavating, or otherwise A. Except as otherwise provided in these <br /> altering their work and will only cut or alter their work General Conditions, OWNER shall issue all communi- <br /> with the written consent of ENGINEER and the others cations to CONTRACTOR through ENGINEER. <br /> whose work will be affected. The duties and <br /> responsibilities of CONTRACTOR under this 8.02 Replacement of ENGINEER <br /> paragraph are for the benefit of such utility owners and <br /> other contractors to the extent that there are A. In case of termination of the employment of <br /> comparable provisions for the benefit of ENGINEER, OWNER shall appoint an engineer to <br /> CONTRACTOR in said direct contracts between whom CONTRACTOR makes no reasonable <br /> OWNER and such utility owners and other objection, whose status under the Contract <br /> contractors. Documents shall be that of the former ENGINEER. <br /> C. If the proper execution or results of any part of 8.03 Furnish Data <br /> CONTRACTOR's Work depends upon work per- <br /> formed by others under this Article 7, CONTRACTOR A. OWNER shall promptly furnish the data <br /> shall inspect such other work and promptly report to required of OWNER under the Contract Documents. <br /> ENGINEER in writing any delays, defects, or deficien- <br /> cies in such other work that render it unavailable or 8.04 Pay Promptly When Due <br /> unsuitable for the proper execution and results of <br /> CONTRACTOR's Work. CONTRACTOR's failure to A. OWNER shall make payments to CONTRAC- <br /> so report will constitute an acceptance of such other TOR promptly when they are due as provided in <br /> work as fit and proper for integration with paragraphs 14.02.0 and 14.07.C. <br /> CONTRACTOR's Work except for latent defects and <br /> deficiencies in such other work. 8.05 Lands and Easements,Reports and Tests <br /> A. OWNER's duties in respect of providing lands <br /> and easements and providing engineering surveys to <br /> establish reference points are set forth in paragraphs <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-27 <br /> FAPublic Works%ENGINEERING DIVISION PROJECTS11213C IRC Shooting Range Hunter Eduction ClassroomtAdmin\bid documents\Master Contract Documents100700-General <br /> Conditions REV 5-10-13.doc <br />