<br /> C. If ENGINEER does not render a formal 2. Cost of all materials and equipment
<br /> decision in writing within the time stated in paragraph furnished and incorporated in the Work, includ-
<br /> 10.05.13, a decision denying the Claim in its entirety ing costs of transportation and storage thereof,
<br /> shall be deemed to have been issued 31 days after and Suppliers' field services required in
<br /> receipt of the last submittal of the claimant or the last connection therewith. All cash discounts shall
<br /> submittal of the opposing party, if any. accrue to CONTRACTOR unless OWNER i
<br /> deposits funds with CONTRACTOR with which
<br /> D. No Claim for an adjustment in Contract Price to make payments, in which case the cash
<br /> I
<br /> or Contract Times (or Milestones) will be valid if not discounts shall accrue to OWNER. All trade
<br /> submitted in accordance with this paragraph 10.05. discounts, rebates and refunds and returns
<br /> from sale of surplus materials and equipment
<br /> shall accrue to OWNER, and CONTRACTOR
<br /> ARTICLE 11 -COST OF THE WORK; CASH shall make provisions so that they may be
<br /> ALLOWANCES; UNIT PRICE WORK obtained.
<br /> i
<br /> I
<br /> 3. Payments made by CONTRACTOR
<br /> 11.01 Cost of the Work to Subcontractors for Work performed by
<br /> Subcontractors. If required by OWNER, LON-
<br /> A. Costs Included. The term Cost of the Work TRACTOR shall obtain competitive bids from
<br /> means the sum of all costs necessarily incurred and subcontractors acceptable to OWNER and
<br /> paid by CONTRACTOR in the proper performance of CONTRACTOR and shall deliver such bids to
<br /> I
<br /> the Work. When the value of any Work covered by a OWNER, who will then determine, with the
<br /> Change Order or when a Claim for an adjustment in advice of ENGINEER,which bids, if any,will be
<br /> Contract Price is determined on the basis of Cost of acceptable. If any subcontract provides that the
<br /> the Work, the costs to be reimbursed to Subcontractor is to be paid on the basis of Cost
<br /> CONTRACTOR will be only those additional or of the Work plus a fee, the Subcontractor's
<br /> -- incremental-costs required because-of the-change in Cost of the Work and fee shall-be determined
<br /> the Work or because of the event giving rise to the in the same manner as CONTRACTOR's Cost
<br /> Claim. Except as otherwise may be agreed to in of the Work and fee as provided in this para-
<br /> writing by OWNER, such costs shall be in amounts no graph 11.01.
<br /> higher than those prevailing in the locality of the
<br /> Project, shall include only the following items, and 4. Costs of special consultants
<br /> shall not include any of the costs itemized in para- (including but not limited to engineers,
<br /> graph 11.01.13. architects, testing laboratories, surveyors,
<br /> attorneys, and accountants) employed for
<br /> 1. Payroll nods for employees in-the services specifically related to the Work.
<br /> direGt-eHapl eFfor
<br /> manse-ef-the Work under-shed les ofjob 5. Supplemental costs including the
<br /> elassif+sations-agreed following:
<br /> CONTRACTOR. Su mployees shall i elude
<br /> wither"imitation—supeFintendents, foremen, a. The proportion of necessary trans-
<br /> and-ether per-senne"mpleyed full tirne-at-tlaa portation, travel, and subsistence expenses of
<br /> bite. Payroll GGStS for employees net employed CONTRACTOR's employees incurred in dis-
<br /> full-time on the-Work shall be appertiened on charge of duties connected with the Work.
<br /> the basic of their time--spent on the WGrk7
<br /> Rayr@ll cods shall inch de but t be limiter!4 b. Cost, including transportation and
<br /> salaries -an,4 merges-plus +he GOSt of fringe maintenance, of all materials, supplies, equip-
<br /> benefrts w#ioh shall , clt+de-sOGialsuety ment, machinery, appliances, office, and
<br /> Fymentt,eXGise, -and temporary facilities at the Site, and hand tools
<br /> payroll taxes workers' ^^mnensatien,health not owned by the workers,which are consumed
<br /> and retirement enents, bonuses siGl-leave; in the performance of the Work, and cost, less
<br /> vaGati , holidayliGablethth—h— market value, of such items used but not con-
<br /> The expenses of nerfbFmiRgAFede-4 sumed which remain the property of CON-
<br /> -reg ay;Sunday, sf TRACTOR.
<br /> legal holidays,shah e-inGltided in the above-to
<br /> thhe-e-xtent authGF!zed by OWNER.
<br /> 00700-General Conditions REV 5-10-13
<br /> 00700-32
<br /> RIPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction Classreom\Admin\bid documenlslMaster Contract Documents100700-General
<br /> Conditions REV 5-10-13.doc
<br />
|