Laserfiche WebLink
r <br /> C. If ENGINEER does not render a formal 2. Cost of all materials and equipment <br /> decision in writing within the time stated in paragraph furnished and incorporated in the Work, includ- <br /> 10.05.13, a decision denying the Claim in its entirety ing costs of transportation and storage thereof, <br /> shall be deemed to have been issued 31 days after and Suppliers' field services required in <br /> receipt of the last submittal of the claimant or the last connection therewith. All cash discounts shall <br /> submittal of the opposing party, if any. accrue to CONTRACTOR unless OWNER i <br /> deposits funds with CONTRACTOR with which <br /> D. No Claim for an adjustment in Contract Price to make payments, in which case the cash <br /> I <br /> or Contract Times (or Milestones) will be valid if not discounts shall accrue to OWNER. All trade <br /> submitted in accordance with this paragraph 10.05. discounts, rebates and refunds and returns <br /> from sale of surplus materials and equipment <br /> shall accrue to OWNER, and CONTRACTOR <br /> ARTICLE 11 -COST OF THE WORK; CASH shall make provisions so that they may be <br /> ALLOWANCES; UNIT PRICE WORK obtained. <br /> i <br /> I <br /> 3. Payments made by CONTRACTOR <br /> 11.01 Cost of the Work to Subcontractors for Work performed by <br /> Subcontractors. If required by OWNER, LON- <br /> A. Costs Included. The term Cost of the Work TRACTOR shall obtain competitive bids from <br /> means the sum of all costs necessarily incurred and subcontractors acceptable to OWNER and <br /> paid by CONTRACTOR in the proper performance of CONTRACTOR and shall deliver such bids to <br /> I <br /> the Work. When the value of any Work covered by a OWNER, who will then determine, with the <br /> Change Order or when a Claim for an adjustment in advice of ENGINEER,which bids, if any,will be <br /> Contract Price is determined on the basis of Cost of acceptable. If any subcontract provides that the <br /> the Work, the costs to be reimbursed to Subcontractor is to be paid on the basis of Cost <br /> CONTRACTOR will be only those additional or of the Work plus a fee, the Subcontractor's <br /> -- incremental-costs required because-of the-change in Cost of the Work and fee shall-be determined <br /> the Work or because of the event giving rise to the in the same manner as CONTRACTOR's Cost <br /> Claim. Except as otherwise may be agreed to in of the Work and fee as provided in this para- <br /> writing by OWNER, such costs shall be in amounts no graph 11.01. <br /> higher than those prevailing in the locality of the <br /> Project, shall include only the following items, and 4. Costs of special consultants <br /> shall not include any of the costs itemized in para- (including but not limited to engineers, <br /> graph 11.01.13. architects, testing laboratories, surveyors, <br /> attorneys, and accountants) employed for <br /> 1. Payroll nods for employees in-the services specifically related to the Work. <br /> direGt-eHapl eFfor <br /> manse-ef-the Work under-shed les ofjob 5. Supplemental costs including the <br /> elassif+sations-agreed following: <br /> CONTRACTOR. Su mployees shall i elude <br /> wither"imitation—supeFintendents, foremen, a. The proportion of necessary trans- <br /> and-ether per-senne"mpleyed full tirne-at-tlaa portation, travel, and subsistence expenses of <br /> bite. Payroll GGStS for employees net employed CONTRACTOR's employees incurred in dis- <br /> full-time on the-Work shall be appertiened on charge of duties connected with the Work. <br /> the basic of their time--spent on the WGrk7 <br /> Rayr@ll cods shall inch de but t be limiter!4 b. Cost, including transportation and <br /> salaries -an,4 merges-plus +he GOSt of fringe maintenance, of all materials, supplies, equip- <br /> benefrts w#ioh shall , clt+de-sOGialsuety ment, machinery, appliances, office, and <br /> Fymentt,eXGise, -and temporary facilities at the Site, and hand tools <br /> payroll taxes workers' ^^mnensatien,health not owned by the workers,which are consumed <br /> and retirement enents, bonuses siGl-leave; in the performance of the Work, and cost, less <br /> vaGati , holidayliGablethth—h— market value, of such items used but not con- <br /> The expenses of nerfbFmiRgAFede-4 sumed which remain the property of CON- <br /> -reg ay;Sunday, sf TRACTOR. <br /> legal holidays,shah e-inGltided in the above-to <br /> thhe-e-xtent authGF!zed by OWNER. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-32 <br /> RIPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction Classreom\Admin\bid documenlslMaster Contract Documents100700-General <br /> Conditions REV 5-10-13.doc <br />