My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 -Work Change Directive <br /> No. <br /> i <br /> DATE OF ISSUANCE: EFFECTIVE DATE: <br /> OWNER: Indian River County I <br /> CONTRACTOR: <br /> Project: INDIAN RIVER COUNTY SHOOTING RANGE HUNTER EDUCATION CLASSROOM <br /> OWNER's Project No. 1213C <br /> You are directed to proceed promptly with the following changes: <br /> I <br /> Description: <br /> Purpose of Work Change Directive: <br /> I <br /> Attachments: (List documents supporting change) <br /> --- ---If OWNER-or- CONTRACTOR-believe-that the above-change has affected Contract-Price any---- <br /> Claim <br /> ny--Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. j <br /> Method of determining change in Method of determining change in <br /> Contract Prices Contract Times <br /> ❑Unit Prices ❑Contractor's Records <br /> ❑Lump Sum ❑Engineer's Records <br /> ❑Other: ❑Other: <br /> II By Change Order: ❑By Change Order: j <br /> I <br /> Estimated increase (decrease) of this Work Estimated increase(decrease) in Contract Times: <br /> Change Directive <br /> $ Substantial Completion: days; <br /> Ready for Final Completion: days. I <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> i <br /> I <br /> ACCEPTED: RECOMMENDED: APPROVED: <br /> By: By: By: <br /> CONTRACTOR (Signature) ENGINEER(Signature) OWNER(Signature) <br /> Date: Date: Date: <br /> ** END OF SECTION <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction Class room\Ndmin\bid <br /> documents\Master Contract Documents\00948-Work Change Directive Rev 08-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.