Laserfiche WebLink
I <br /> SECTION 01215 <br /> GENERAL QUALITY CONTROL <br /> 1.5 PROJECT PHOTOGRAPHS/VIDEOS { <br /> A. The CONTRACTOR shall make provisions, at his expense, for photographs and <br /> video tapes of all work areas just prior to construction, and for unusual conditions <br /> during construction. The photographs and videos shall show pertinent physical <br /> features along the line of construction. The purpose of the videos is to determine <br /> any damage to private or public property during construction. The video must be <br /> performed by a professional videographer. j <br /> I <br /> B. Pre-Construction Photographs and Video: j <br /> 1. Contractor shall provide the Owner with photographs and video record and one <br /> copy of the existing conditions prior to construction. These photographs and <br /> videos shall be a standard DVD format and shall be narrated. <br /> 2. The photographs and video shall include, but not be limited to, the following <br /> items shown in a clear manner: <br /> 1) All existing features within the right-of-way. <br /> 2) All existing features within the temporary construction easement. <br /> 3) All existing features within permanent easements. <br /> 4) All existing features adjacent to any construction. <br /> 3. Detail of the photographs and video shall be such that the following examples <br /> shall be clear and visible: <br /> 1) Cracks in walls. <br /> 2) Condition of fencing. <br /> 3) Condition of planted areas and types of vegetation. <br /> 4) Condition of sodded areas. <br /> 5) Conditions of sprinkler systems and associated controls and wiring. <br /> 6) Condition of signs. <br /> 7) Conditions of lighting and associated wiring. <br /> 8) Significant detail of any pre-existing damages physical features shall be j <br /> shown. The coverage of the photographs and video should include the <br /> limits of effects of the use of vibratory rollers. <br /> 9) These photographs and video record shall be presented and approved <br /> by the Owner prior to the Notice to Proceed. A copy shall be kept in the <br /> Contractor's field office. <br /> 10)Payment— No additional payment will be made for this work. <br /> + + END OF SECTION + + <br /> I <br /> I <br /> 01215-2 01215 General Quality Control <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction Classroom\Admin\bid <br /> documents\Master Contract Documents\01215 General Quality.doc <br /> I <br /> i <br />