Laserfiche WebLink
r <br /> SECTION 01310 <br /> i <br /> CONSTRUCTION SCHEDULES <br /> i <br /> 1.4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br /> I <br /> A. After receiving approval by the ENGINEER, distribute copies of the <br /> approved initial schedule and all reviewed revisions (updated) to: i <br /> 1. Job site file. <br /> 2. Subcontractors. <br /> 3. Other concerned parties. <br /> 4. OWNER (two copies). I <br /> 5. ENGINEER <br /> i <br /> B. In the cover letter, instruct recipients to report promptly to the <br /> CONTRACTOR, in writing, any problems anticipated by the projections <br /> shown in the schedules. <br /> I <br /> + + END OF SECTION + + <br /> i <br /> i <br /> i <br /> 01310-2 01310 Construction Schedule j <br /> I <br /> FAPublic works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction Class room\Admin\bid <br /> documents\Master Contract Documents\01310-Construction Schedule.doc <br />