Laserfiche WebLink
21.02 OWNER shall return one fully signed counterpart to Successful Bidder. <br /> 21.03 Should Bidder to whom the Contract has been awarded refuse or fail to complete the <br /> requirements of Article 21.01 above,,the additional time in calendar days, required to correctly <br /> complete the documents will be deducted, in equal amount, from the Contract time. Or, the <br /> OWNER may elect to revoke the Award and the OWNER shall hold the Bid Bond for <br /> consequential damages incurred, and the Contract may be awarded as the OWNER desires. <br /> * *END OF SECTION <br /> I <br /> i <br /> i <br /> I <br /> i <br /> I <br /> 00200-instructions to Bidders REV 04-07 <br /> 00200-11 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction ClassroomWdmin\bid documents\Master Contract Documents\00200- <br /> Instructions to Bidders REV 04-07.doc Rev.05101 <br />