My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is <br /> I , <br /> SECTION 01340 <br /> SUBMITTAL OF SHOP DRAWINGS <br /> i <br /> M. Upon return of a submittal marked Revise and Resubmit make the <br /> p ., <br /> corrections indicated and repeat the initial approval procedure. The "Not <br /> Approved" notation is used to indicate material or equipment that is not <br /> acceptable. Upon return of a submittal so marked, repeat the initial <br /> approval procedure utilizing acceptable material or equipment. <br /> N. Work shall not be performed nor equipment installed without an <br /> "Approved" or"Approved as Noted" Shop Drawing will be at the sole <br /> responsibility of the CONTRACTOR. <br /> O. Submit Shop Drawings well in advance of the need for the material or <br /> equipment for construction and with ample allowance for the time required <br /> to make delivery of material or equipment after data covering such is <br /> approved. CONTRACTOR shall assume the risk for all materials or <br /> equipment which is fabricated or delivered prior to the approval of Shop <br /> Drawings. Materials or equipment will not be included in periodic progress <br /> payments until approval thereof has been obtained in the specified <br /> manner. <br /> P. ENGINEER will review and process all submittals promptly, but a <br /> reasonable time should be allowed for this for the ShopDrawings being <br /> g g <br /> revised and resubmitted, and for time required to return the approved <br /> Shop Drawings to CONTRACTOR. <br /> Q. Furnish required submittals with complete information and accuracy in <br /> order to achieve required approval of an item within three submittals. All <br /> costs to ENGINEER involved with subsequent submittals of Shop <br /> Drawings, Samples or other items requiring approval, will be back-charged <br /> to CONTRACTOR in accordance with the General Conditions and the <br /> Supplementary Conditions. If the CONTRACTOR requests a substitution <br /> for a previously approved item, all of ENGINEER'S costs in the reviewing <br /> and approval of the substitution will be back-charged to CONTRACTOR <br /> unless the need for such substitution is beyond the control of <br /> CONTRACTOR. <br /> + + END OF SECTION + + <br /> 01340-Submittal of Shop Drawings <br /> 01340-6 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction ClassroomMmin\bid documents\Master <br /> Contract Documents\01340-Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.