My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SECTION 01610 <br /> TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> G. Immediately on delivery, the CONTRACTOR shall inspect shipment to assure: <br /> 1. Product complies with requirements of Contract Documents and reviewed <br /> submittals. <br /> 2. Quantities are correct. <br /> 3. Containers and packages are intact, labels are legible. <br /> 4. Products are properly protected and undamaged. <br /> 1.3 PRODUCT HANDLING <br /> A. Provide equipment and personnel necessary to handle products, including <br /> those provided by OWNER, by methods to prevent soiling or damage to <br /> products or packaging. <br /> B. Provide additional protection during handling as necessary to prevent scraping, <br /> marring or otherwise damaging products or surrounding surfaces. <br /> C. Handle products by methods to prevent bending or overstressing. <br /> D. Lift heavy components only at designated lifting points. <br /> E. Materials and equipment shall at all times be handled in a safe manner and as <br /> recommended by manufacturer or supplier so that no damage will occur to <br /> them. Do not drop, roll or skid products off delivery vehicles. Hand carry or use <br /> suitable materials handling equipment. <br /> i <br /> + + END OF SECTION + + <br /> 01610-2 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction Class room\Admin\bid <br /> documents\Master Contract Documents\01610-Transportation and Handling of Materials and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.