My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 3.02 Each bid must contain evidence of Bidder's qualification to do business in the state <br /> where the Project is located or covenant to obtain such qualification prior to award of the contract. <br /> 3.03 The OWNER reserves the right to reject bids from Bidders that are unable to meet the <br /> listed required qualifications. <br /> ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND <br /> SITE <br /> 4.01 Subsurface and Physical Conditions <br /> A. The Supplementary Conditions identify: <br /> 1. Those reports of explorations and tests of subsurface conditions at or contiguous to <br /> the Site that Engineer has used in preparing the Bidding Documents. <br /> 2. Those drawings of physical conditions in or relating to existing surface and subsurface <br /> structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used <br /> in preparing the Bidding Documents. <br /> I <br /> B. Copies of reports and drawings referenced in paragraph 4.01.A will be made available j <br /> by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract <br /> Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as <br /> provided in paragraph 4.02 of the General Conditions has been identified and established in <br /> paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or <br /> conclusion Bidder draws from any"technical data" or any other data, interpretations, opinions or <br /> information contained in such reports or shown or indicated in such drawings. <br /> 4.02 Underground Facilities <br /> A. Information and data shown or indicated in the Bidding Documents with respect to existing <br /> Underground Facilities at or contiguous to the Site is based upon information and data furnished <br /> to OWNER and ENGINEER by OWNERs of such Underground Facilities, including OWNER, or <br /> others. <br /> 4.03 Hazardous Environmental Condition <br /> A. The Supplementary Conditions identify those reports and drawings relating to a <br /> Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in <br /> preparing the Bidding Documents. <br /> B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available by <br /> OWNER to any Bidder on request. Those reports and drawings are not part of the Contract <br /> Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as <br /> provided in paragraph 4.06 of the General Conditions. Bidder is responsible for any interpretation <br /> or conclusion Bidder draws from any "technical data" or any other data, interpretations, opinions, <br /> or information contained in such reports or shown or indicated in such drawings. <br /> 4.04 Provisions concerning responsibilities for the adequacy of data furnished to <br /> prospective Bidders with respect to subsurface conditions, other physical conditions and <br /> Underground Facilities, and possible changes in the Bidding Documents due to differing or <br /> 00200-Instructions to Bidders REV 04-07 <br /> 00200-2 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction Classroom\Admin\bid documents\Master Contract Documents\00200- <br /> Instructions to Bidders REV 04-07.doc Rev 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.