My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027F
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:52 AM
Creation date
3/21/2017 2:21:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027F
Agenda Item Number
12.F.1
Entity Name
Community Asphalt Corporation
Subject
Round Island Park Pavement Resurfacing
Contract & Specifications
Area
Round Island Park
Project Number
1619
Bid Number
201717
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br /> Date of Issuance: 20 <br /> OWNER: Indian River County <br /> CONTRACTOR- <br /> Project No.: 1619 <br /> Project Description: Milling and resurfacing of the existing roads and parking areas in Round <br /> Island Park. Full depth reclamation of the asphalt area of the boat launching ramp and <br /> regrading of the existing Swale. Pavement markings, signage, a small section of new sidewalk <br /> and sodding will also be included in this proiect. <br /> OWNER's Bid No. 2017017 <br /> CONTRACT FOR: ROUND ISLAND RIVERSIDE PARK PAVEMENT RESURFACING. <br /> This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br /> to the following specified parts thereof: <br /> To- <br /> OWNER <br /> And To- <br /> CONTRACTOR <br /> The Work to which this Certificate applies has been inspected by authorized representatives of <br /> OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br /> substantially complete in accordance with the Contract Documents on <br /> DATE OF SUBSTANTIAL COMPLETION <br /> A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br /> inclusive, and the failure to include an item in it does not alter the responsibility of <br /> CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br /> items in the tentative list shall be completed or corrected by CONTRACTOR within 30 calendar <br /> days of the above date of Substantial Completion. <br /> 00630-Certificate of Substantial Completion REV 04-07 <br /> 00630-1 <br /> F-\Public Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract Documents\00630-Certificate of <br /> Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.