Laserfiche WebLink
concept of the completed Project as a functioning 4. When "furnish," "install, "perform," or <br /> whole as shown or indicated in the Contract "provide" is not used in connection with services, <br /> Documents (unless there is a specific statement materials, or equipment in a context clearly <br /> indicating otherwise) The use of any such term or requiring an obligation of CONTRACTOR, <br /> adjective shall not be effective to assign to ENGI- "provide" is implied. <br /> NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or E. Unless stated otherwise in the Contract Docu- <br /> authority to undertake responsibility contrary to the ments, words or phrases which have a well-known <br /> provisions of paragraph 9.10 or any other provision technical or construction industry or trade meaning are <br /> of the Contract Documents. used in the Contract Documents in accordance with <br /> such recognized meaning. <br /> B. Day <br /> 1. The word "day" shall constitute a ARTICLE 2 - PRELIMINARY MATTERS <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. <br /> 2.01 Delivery of Bonds <br /> C. Defective <br /> A. When CONTRACTOR delivers the executed <br /> 1. The word "defective,"when modifying Agreements to OWNER, CONTRACTOR shall also <br /> the word "Work," refers to Work that is deliver to OWNER such Bonds as CONTRACTOR <br /> unsatisfactory, faulty, or deficient in that it does may be required to furnish. <br /> not conform to the Contract Documents or does <br /> not meet the requirements of any inspection, 2.02 Copies of Documents <br /> reference standard, test, or approval referred to <br /> in the Contract Documents, or has been A. OWNER shall furnish to CONTRACTOR up <br /> damaged prior to ENGINEER's recom- to ten copies of the Contract Documents. Additional <br /> mendation of final payment (unless responsi- copies will be furnished upon request at the cost of <br /> bility for the protection thereof has been reproduction. <br /> assumed by OWNER at Substantial <br /> Completion in accordance with paragraph 2.03 Commencement of Contract Times;Notice <br /> 14.04 or 14.05). to Proceed <br /> D Furnish, Install, Perform, Provide A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> 1. The weld "furnish," when—:sed—;,; ment or, if a Notice to Proceed is given, on the day <br /> senneetien with sewises, materials, or indicated in the Notice to Proceed A Notice to Pro- <br /> it, shall mean to supply and delive may be given at any time within 30 days after the <br /> said servises,materials, e I .I eat to the Effective Date of the Agreement. In no event will the <br /> Contract Times commence to run later than the <br /> use <br /> i^s+,"a+;^^ ^^a usable 9F operablee ninetieth day after the day of Bid opening or the <br /> seaditiert thirtieth day after the Effective Date of the Agreement, <br /> whichever date is earlier. <br /> 2. The wereinstall," when used in <br /> seAneGtien with—seFViGes, rnate,F;als, or 2.04 Starting the Work <br /> in final position said—seFviGes, materials—Or A. CONTRACTOR shall start to perform the <br /> Work on the date when the Contract Times com- <br /> tse. mence to run. No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> 3. The words " run. <br /> when used iFl Gen„est',ORwith—SefVi^v^��r <br /> materials, t, c"^” FReaR +^ f Rich 2.05 Before Starting Construction <br /> ^'s„l—Baia—serrises, mateFials, er <br /> it GGIMplete and ready fGF A. CONTRACTOR's Review of Contract Docu- <br /> use. ments: Before undertaking each part of the Work, <br /> CONTRACTOR shall carefully study and compare the <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-8 <br /> F\Public Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documentsWaster Contract Documents\00700-General Conditions REV 5-10- <br /> 13.doc <br />