of CONTRACTOR's intention to cover the same and or entityOF any surety for OF employee OF agent of
<br /> ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice.
<br /> 13.06 Correction or Removal of Defective Work
<br /> 13 04 Uncovering Work
<br /> A. CONTRACTOR shall correct all defective
<br /> A. If any Work is covered contrary to the written Work, whether or not fabricated, installed, or
<br /> request of ENGINEER, it must, if requested by ENGI- completed, or, if the Work has been rejected by ENGI-
<br /> NEER, be uncovered for ENGINEER's observation NEER, remove it from the Project and replace it with
<br /> and replaced at CONTRACTOR's expense. Work that is not defective. CONTRACTOR shall pay
<br /> all Claims, costs, losses, and damages (including but
<br /> B. If ENGINEER considers it necessary or not limited to all fees and charges of engineers,
<br /> advisable that covered-Work be observed by ENGI- architects, attorneys, and other professionals and all
<br /> NEER or inspected or tested by others, CONTRAC- court or arbitration or other dispute resolution costs)
<br /> TOR, at ENGINEER's request, shall uncover, expose, arising out of or relating to such correction or removal
<br /> or otherwise make available for observation, inspec- (including but not limited to all costs of repair or
<br /> tion, or testing as ENGINEER may require, that replacement of work of others).
<br /> portion of the Work in question, furnishing all neces-
<br /> sary labor, material, and equipment. If it is found that 13 07 Correction Period
<br /> such Work is defective, CONTRACTOR shall pay all
<br /> Claims, costs, losses, and damages(including but not A.
<br /> limited to all fees and charges of engineers, architects,
<br /> attorneys, and other professionals and all court or preGGFibed by Laws OF Regulations OF by the teFrAs 9
<br /> arbitration or other dispute resolution costs)arising out any applicable snenial guarantee required by the
<br /> of or relating to such uncovering, exposure, observa-
<br /> tion, inspection, and testing, and of satisfactory
<br /> ______ replacement or reconstruction (including_but_not defel3tive,
<br /> limited to all costs of repair or replacement of work of !i - - --
<br /> others); and OWNER shall be entitled to an OWNER or permitted by Laws and Regulations as
<br /> appropriate decrease in the Contract Price. If the GOnternplated in paragraph 6.11.A is fOURd to
<br /> parties are unable to agree as to the amount thereof,
<br /> OWNER may make a Claim therefor as provided in to OWNER and on aGGGFdanGe with OWNER's written
<br /> paragraph 10.05. If, however, such Work is not found R.Gbrur_,tiens� (i) repair SUGh defel3tive and or areas,-OF
<br /> to be defective, CONTRACTOR shall be allowed an (ii)-serrest SUGh defeslive WeFk or, if the defeGtive
<br /> increase in the Contract Price or an extension of the Work has beeR FejeGted by Ferneve it
<br /> Contract Times (or Milestones), or both, directly the-RFejest-aad-Fepl, Ge it with WOFk that iso
<br /> attributable to such uncovering, exposure,
<br /> observation, inspection, testing, replacement, and
<br /> reconstruction. If the parties are unable to agree as to vVerh of Others OF other land OF areas resulting there
<br /> the amount or extent thereof, CONTRACTOR may €FeFF�.- If CONTRACTOR does not promptly comply
<br /> make a Claim therefor as provided in paragraph with the terms of such instructions, or in an
<br /> 10.05. emergency where delay would cause serious risk of
<br /> loss or damage, OWNER may have the defective
<br /> 1305 OWNER May Stop the Work Work corrected or repaired or may have the rejected
<br /> Work removed and replaced, and all Claims, costs,
<br /> A. if the VVoFk is defel3tive, OF GONTRACTOR losses, and damages (including but not limited to all
<br /> fails tesupply suf„Giegt-skilled woFkers ^rte:;-Able fees and charges of engineers, architects, attorneys,
<br /> and other professionals and all court or arbitration or
<br /> other dispute resolution costs) arising out of or relating
<br /> the GontraGt DE)GUments, OWNER may order GON to such correction or repair or such removal and
<br /> thereof,TRAGTOR to stop the WeFk, or any paFtien replacement (including but not limited to all costs of
<br /> until the nai ise for S„nh Order has been efiminatede, repair or replacement of work of others)will be paid by
<br /> howeveF, this Fight of OWNER to stop the WeFk shall CONTRACTOR.
<br /> not give Fise to any duty OR the part of OWNER to
<br /> exeFGmse this Fight f0F the benefit of GONTRACT-OR, B.
<br /> any SubGOntraGtOF, any SupplieF, any OtheF individualitem of equipment is planedin nnntinins s seniine
<br /> before Substantial Gempletion of all the WoFk, the
<br /> 00700-General Conditions REV 5-10-13
<br /> 00700-37
<br /> F\Public Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract Documents\00700-General Conditions REV 5-10-
<br /> 13.doc
<br />
|