My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027F
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:52 AM
Creation date
3/21/2017 2:21:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027F
Agenda Item Number
12.F.1
Entity Name
Community Asphalt Corporation
Subject
Round Island Park Pavement Resurfacing
Contract & Specifications
Area
Round Island Park
Project Number
1619
Bid Number
201717
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the work and to discuss schedules referred to in paragraph 2.05.B, procedures for <br /> handling Shop Drawings and other submittals, and maintaining required records. <br /> Utility companies and others as appropriate will be requested to attend to discuss <br /> and coordinate work. <br /> B. Per the FDOT Standard Specifications for Road and Bridge Construction, the <br /> Contractor will certify to the Engineer the following: <br /> 1. A listing of on-site clerical staff, supervisory personnel and their pro-rated <br /> time assigned to the contract, <br /> 2. Actual Rate for items listed in Table 4-3.2.1 (see below), <br /> 3. Existence of employee benefit plan for Holiday, Sick and Vacation benefits <br /> and a Retirement Plan, and, <br /> 4. Payment of Per Diem is a company practice for instances when <br /> compensation for Per Diem is requested. <br /> Such certification must be made by an officer or director of the Contractor with <br /> authority to bind the Contractor. Timely certification is a condition precedent to <br /> any right of the Contractor to recover compensations for such costs, and failure <br /> to timely submit the certification will constitute a full, complete, absolute and <br /> irrevocable waiver by the Contractor of any right to recover such costs. Any <br /> subsequent changes shall be certified to the Engineer as part of the cost <br /> proposal or seven calendar days in advance of performing such extra work. <br /> FDOT Table 4-3.2.1 <br /> Item Rate <br /> FICA Rate established by Law <br /> FUTA/SUTA Rate established by Law <br /> — — --- — ---Actual— <br /> Holidays, <br /> -- - -- — <br /> -- a Ica-nsurance --- --- - - ---- --- �---� - --- ctua---- <br /> Holida s, Sick&Vacation Benefits Actual <br /> Retirement Benefits Actual <br /> Rates based on the National Council on <br /> Compensation Insurance basic rates tables <br /> Workers Compensation adjusted by Contractor's actual experience <br /> modification factor in effect at the time of the <br /> additional work or unforeseen work <br /> Per Diem Actual but not to exceed State of Florida's rate <br /> Insurance* Actual <br /> *Compensation for Insurance is limited solely to General Liability Coverage and does not include any other <br /> insurance coverage(such as, but not limited to, Umbrella Coverage,Automobile Insurance,etc.). <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> SC-3.06 Add the following new paragraphs immediately after paragraph GC-3.05: <br /> SC-3.06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows: <br /> 1. Written Interpretations <br /> 2. Addenda <br /> 3. Specifications <br /> 4. Supplementary Conditions to the General Conditions <br /> 5. ' General Conditions <br /> 6. Approved Shop Drawings <br /> 7. Drawings <br /> 8. Referenced Standards. <br /> 00800-2 <br /> 00800-Supplementary Conditions 05-13 rev <br /> 00800 2F\Public Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract Documents\00800- <br /> Supplemenlary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.