Laserfiche WebLink
i <br /> SC-6.08 Permits <br /> SC-6.08 Add the following paragraphs immediately after paragraph GC-6.08.A: <br /> 1. The OWNER has obtained the following permits: None Required <br /> 2. The CONTRACTOR shall obtain and pay for all other required permits and <br /> licenses. The CONTRACTOR shall provide copies of the permits to the <br /> OWNER and ENGINEER and shall comply with all conditions contained in <br /> the permits at no extra cost to the OWNER. <br /> 3. The CONTRACTOR shall be familiar with all permit requirements during <br /> construction and shall be responsible for complying with these <br /> requirements. The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with. <br /> j <br /> SC-11.01 Cost of the Work <br /> SC-11.01.A.1. Delete paragraph GC-11.01.A.1 in its entirety, and insert the following sentences <br /> in its place: <br /> 1. CONTRACTOR will receive payment for actual costs of direct labor and burden <br /> (see SC-2.06.13) for the additional or unforeseen work. Labor includes foremen <br /> actually engaged in the work; and will not include project supervisory personnel nor <br /> necessary on-site clerical staff, except when the additional or unforeseen work is a <br /> controlling work item and the performance of such controlling work item actually <br /> extends completion of the project due to no fault of the Contractor. Compensation <br /> for project supervisory personnel, but in no case higher than a Project Manager's <br /> position, shall only be-for the pro—rata—time such--supervisory personnel spenton - — - <br /> the contract. In no case shall an officer or director of the Company, nor those <br /> persons who own more than 1% of the Company, be considered as project <br /> supervisory personnel, direct labor or foremen hereunder. The expenses of <br /> P rY P p <br /> performing Work outside of regular working hours on Saturday, Sunday, or legal <br /> holidays, shall be included in the above to the extent authorized by OWNER. <br /> SC-13.03 Test and Inspections <br /> SC-13.03.13. Delete paragraph GC-13.03.8 in its entirety, and insert the following sentences in <br /> its place: <br /> B. OWNER shall employ and pay for the services of an independent testing laboratory to <br /> perform all initial inspections, tests, or approvals .required by the Contract Documents <br /> except those inspections, tests, or approvals listed immediately below. Subsequent <br /> inspections, tests, or approvals required after initial failing inspections, tests, or <br /> approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br /> applications for payment. The CONTRACTOR shall arrange, obtain, and pay for the <br /> following inspections, tests, or approvals: <br /> 1. inspections, tests, or approvals covered by paragraphs 13.03.0 and 13.03.D <br /> below; <br /> 2. costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13.04.13 shall be paid as provided in said paragraph 13.04.13; <br /> 3. tests otherwise specifically provided in the Contract Documents. <br /> 00800-7 <br /> 00800-Supplementary Conditions 05-13 rev <br /> 00800 7F\Public Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract Documents\00800- <br /> Supplementary Conditions 05-13 rev.doc <br />