Laserfiche WebLink
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> determine said locations. Extreme caution shall be exercised to eliminate any <br /> possibility of any damage to utilities resulting from his activities. <br /> 1.7 ADJUSTMENTS OF UTILITY CASTINGS COVERS AND BOXES <br /> A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br /> boxes, inlets and similar structures in the areas of construction that are to <br /> remain in service shall be adjusted by the CONTRACTOR to bring them flush <br /> with the surface of the finished work. <br /> B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br /> sequencing. CONTRACTOR shall make available survey reference markers to <br /> the various utility companies. <br /> + + END OF SECTION + + <br /> i <br /> 01541-5 FAPublic Works\ENGINEERING DIVISION <br /> PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract Documents\01541-Protection of Property.doc <br />