My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027F
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:52 AM
Creation date
3/21/2017 2:21:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027F
Agenda Item Number
12.F.1
Entity Name
Community Asphalt Corporation
Subject
Round Island Park Pavement Resurfacing
Contract & Specifications
Area
Round Island Park
Project Number
1619
Bid Number
201717
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01611 <br /> STORAGE OF MATERIAL AND EQUIPMENT <br /> 1.1 GENERAL <br /> A. Store and protect materials and equipment in accordance with manufacturer's <br /> recommendations and requirements of Specifications. <br /> B. Make all arrangements and provisions necessary for the storage of materials <br /> and equipment. Place all excavated materials, construction equipment, and <br /> materials and equipment to be incorporated into the Work, so as not to injure <br /> any part of the Work or existing facilities, and so that free access can be had at <br /> all times to all parts of the Work and to all public utility installations in the vicinity <br /> of the Work. Keep materials and equipment neatly and compactly stored in <br /> locations that will cause a minimum of inconvenience to other contractors, <br /> public travel, adjoining owners, tenants and occupants. Arrange storage in a <br /> manner to provide easy access for inspection. <br /> C. Areas available on the construction site for storage of material and equipment <br /> shall be as shown or approved by the ENGINEER. ' <br /> D. Store materials and equipment which are to become the property of the <br /> OWNER to facilitate their inspection and insure preservation of the quality and <br /> fitness of the Work, including proper protection against damage by extreme ` <br /> temperatures and moisture. <br /> E. Do not use lawns, grass plots or other private property for storage purposes <br /> without written permission of the OWNER or other person in possession or ' <br /> control of such premises. <br /> F. CONTRACTOR shall be fully responsible for loss or damage to stored <br /> materials and equipment. <br /> G. Do not open manufacturer's containers until time of installation unless <br /> recommended by the manufacturer or otherwise specified. <br /> H. When appropriate store materials on wood blocking so there is no contact with <br /> the ground. <br /> + + END OF SECTION + + <br /> 01611-1 01611—Storage of Material <br /> F-\Public Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract <br /> Documents\01611 -Storage of Materials.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.