Laserfiche WebLink
❑ (b) Clearly shows by symbols, notations,or delineations, those constructed <br /> improvements located by the survey. <br /> ❑ (c) All maps prepared shall meet applicable minimum technical standards. <br /> ❑ (d) Vertical and horizontal accuracy of the measurements made shall be such <br /> that it may be determined whether the improvements were constructed <br /> consistent with planned locations. <br /> I <br /> [The remainder of this page was left blank intentionally] <br /> 01025-10 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1619 Round Island Facility Paving\1-Admin\bid documents\Master Contract i <br /> Documents\Technical Specifications.doc <br />