F.D.0.T.(69 74) SR 826(Palmetto)NW 167 $8,961,213 $3,584,485 $5,376,728 $2,318,432
<br /> St and SR 817(NW 27Ave)
<br /> F.D.O.T.(6978) SR 90(US41) $1,074,499 $429,800 $644,699 $30,330
<br /> F.D.O.T.(7000) HEFT Widening(Bird Road $111,500,000 $44,600,000 $66,900,000 $57,032,637
<br /> to Dolphin Expy)
<br /> City of Vero Beach Construct,Mark&Lighw $2,975,657 $1,190,263 $1,785,394 $724,106
<br /> (7009) West GA Apron
<br /> City of Fort 10851 Lakeridge Sunrise $1,080,520 $432,208 $648,312 $97,055
<br /> Lauderdale(7011) Blvd
<br /> Rosso Site PB Int 7Airport Taxiway W $631,026 $252,410 $378,616 $4,050
<br /> Development(7012)
<br /> Lee County BOCC Countywide Resurfacing#2 $687,824 $275,130 $412,694 $5,818
<br /> (7013) 2016
<br /> FDOT(7014) SR 76 Kannter Highway $20,446,000 $8,178,400 $12,267,600 $10,047,817
<br /> Reconstruction
<br /> FDOT(7018) SR 916 NE 135 St and SR $1,071,254 $428,502 $642,753 $520,398
<br /> 916 Opalocka Blvd
<br /> Village of Wellington Pierson Road Realignment $535,244 $214,097 $321,146 $243,769
<br /> (7019) Project
<br /> AM-JETAsphalt Boca Raton Sailing& $173,316 $69,326 $103,990 $103,990
<br /> (7022) Raquet Club
<br /> Palm Beach Cnty Dept PB 15-IS Rehab of Taxiway $7,692,485 $3,076,994 $4,615,491 $4,615,491
<br /> of Airports(702 7) C
<br /> Guettler&Sons(7029) Ktalia PH4,Units 2&3 $113,861 $45,545 $68,317 $68,317,
<br /> City of Cape Coral Cape Coral Road $4,321,099 $1,728,440 $2,592,659 $674,914
<br /> (7030) Resurfacing 2016
<br /> Guettler&Sons(7031) Tradition Health Park $153,297 $61,319 $91,978 $52,872
<br /> City of Cape Coral Cape Coral Major $1,844,095 $737,638 $1,106,457 $751,623
<br /> (7032) Resurfacing 2016
<br /> FDOT(7033) Coconut Creek Parkway $2,564,262 $1,025,705 $1,538,557 $1,538,557
<br /> F.D.O.T.(7034) DIP69 RO-Asphalt Repair $994,995 $397,998 $596,997 $596,997
<br /> in Lee County
<br /> SL V Millstone,LLC Millstone Southside Final $193,397 $77,359 $116,038 $4,950
<br /> (7035) Lift
<br /> Morrison-Cobalt SR9/I95 Bridge Deck $1,881,573 $752,629 $1,128,944 $941,276
<br /> JV(7036) Replacement
<br /> Rosso Site Lyons Road(Lantana Rd to $394,451 $157,781 $236,671 $204,465
<br /> Development(703 7) Northe of LWDD L-14
<br /> City of Sanibel(7040) Sanibel 2016 Street $414,499 $165,800 $248,699 $29,444
<br /> resurfacing
<br /> H&R of Bell Glade 2016 Sugar Mills $142,019 $56,808 $85,211 $25,260
<br /> (7042)
<br /> Tim Rose Contracting Old Dixie Hwy Resurfacing $458,630 $183,452 $275,178 $21,533
<br /> (7051)
<br /> Guettler&Sons(7054) Brentwood Lakes $230,000 $92,000 $138,000 $138,000
<br /> Tim Rose Contracting Barber Street Reconstruction $132,215 $52,886 $79,329 $12,304
<br /> (7055)
<br /> Rio-Bak Corp.(7050) Saddletrail Park South $458,630 $183,452 $275,178 $21,533
<br />
|