Laserfiche WebLink
SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and Community pCorp.Asphalt Cor <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> Milling and resurfacing of the existing roads and parking areas in Round Island Park. <br /> Full depth reclamation of the asphalt area of the boat launching ramp and regrading of <br /> the existing swa/e. Pavement markings, signage, a small section of new sidewalk and <br /> sodding will also be included in this project. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows- <br /> Project Name: ROUND ISLAND RIVERSIDE PARK PAVEMENT RESURFACING <br /> County Project Number: 1619 <br /> Bid Number: 2017017 <br /> Project Address: 2200 South A1A, Vero Beach, Florida 32963 <br /> ARTICLE 3 — ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> B. The Contractor may only close the park entrance and associated facilities for (14) calendar <br /> days. All resurfacing activities requiring closure or detouring of the internal park roadways <br /> or the main entrance off of U.S. -Al shall be completed within this timeframe. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> 00520-Agreement(Public Works)REV 06-14 <br /> 00520-2 <br /> F:\Purchasing\Bids\2016-2017 FY(2017000)\2017017 Round Island Riverside Park Pavement\00520-Agreement(Public Works)REV 06-14.doc <br />