My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-081
CBCC
>
Resolutions
>
2000's
>
2008
>
2008-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2024 11:35:56 AM
Creation date
3/22/2017 4:52:41 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2008-081
Approved Date
06/17/2008
Agenda Item Number
12.J.1.
Resolution Type
Time and Place
Entity Name
San Sebastian Springs Subdivision
Subject
Water main extension
Area
Sebastian
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />Department of Utility Services <br />Memo <br />To: Dan Chastain, Assessment Manager <br />From: Gordon E. Sparks, P.E., Environmental Engineer 6ES <br />Thru: Mike Hotchkiss, P.E., Capital Projects Manager r <br />CC: W. Eric Olson, Director <br />Date: May 28, 2008 <br />Re: IRC — San Sebastian Springs Subdivision Water Assessment, UCP # 3014 <br />WIP #473-169000-08502 <br />Cost Estimate for Assessment <br />Attached is the estimated cost to install the water main and appurtenances for the San Sebastian Springs <br />Subdivision including Engineering, Permitting and Surveying. My cost estimate is $733,500.00. Therefore, I <br />recommend $735,000.00 be used for the Assessment Roll. <br />GES/ges <br />Page 1 <br />F:\Utilities\UTILITY - ENGINEERING\Projects - Assessment Projects\SAN SEBASTIAN SPRINGS SUBDN ATTACHMENT <br />Estimate for Assessment 5-2M8.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.