Laserfiche WebLink
ARTICLE 6 INTEREST <br /> Not Applicable <br /> ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations: <br /> 71 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, <br /> work, site, locality, and all local conditions and laws and regulations that in any manner may <br /> affect cost, progress, performance or furnishing of the work. <br /> 72 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface <br /> conditions and drawings of physical conditions which are identified in the Supplementary <br /> Conditions as provided in Paragraph 4 02 of the General Conditions, and accepts the <br /> determination set forth in Paragraph SC-4.02 of the Supplementary Conditions of the extent <br /> of the technical data contained in such reports and drawings upon which CONTRACTOR is <br /> entitled to rely <br /> 73 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining <br /> and carefully studying) all such examinations, investigations, explorations, tests, reports and <br /> studies (in addition to or to supplement those referred to in Paragraph 7 2 above) which <br /> pertain to the subsurface or physical conditions at or contiguous to the site or otherwise may <br /> affect the cost, progress, performance or furnishing of the work as CONTRACTOR considers <br /> necessary for the performance of furnishing of the work at the Contract Price, within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4.02 of the General Conditions; <br /> and no additional examinations, investigations, explorations, tests, reports, studies or similar <br /> information or data are or will be required by CONTRACTOR for such purposes. <br /> 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br /> the Contract Documents with respect to existing underground facilities at or contiguous to the <br /> site and assumes responsibility for the accurate location of said underground facilities. No <br /> additional examinations, investigations, explorations, tests, reports, studies or similar <br /> information or data in respect of said underground facilities are or will be required by <br /> CONTRACTOR in order to perform and furnish the work at the Contract Price, within the <br /> Contract Time and in accordance with the other terms and conditions of the Contract <br /> Documents, including specifically the provisions of Paragraph 4.04 of the General Conditions. <br /> 7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br /> investigations, explorations, tests, reports and studies with the terms and conditions of the <br /> Contract Documents. <br /> 76 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br /> that he has discovered in the Contract Documents and the written resolution thereof by <br /> ENGINEER is acceptable to CONTRACTOR <br /> 00530-5 <br />