Laserfiche WebLink
FINAL COST FOR: <br />9TH COURT SW BETWEEN OSLO ROAD & 11TH STREET SW <br />DATE: January 26,1999 <br />PROJECT NO. 9328 <br />FINAL COST <br />TOTAL F.F. <br />TOTAL LF <br />2,498.07 <br />1,332.00 <br />CONSTRUCTION <br />Labor 821,009.43 <br />Equipment 515,945.14 <br />Asphalt 57,306.15 <br />Outside Labor 82,067.75 <br />Sod 52,621.40 <br />Pipe 82,568.63 <br />Catch Basins 8466.00 <br />Limetock 57.743 39 <br />Total Construction Costs: 559,727.89 859,727.89 <br />PERMIT FEES 8350.00 8350.00 <br />ROW ACQUISITION & N/A N/A <br />TITLE SPARC"! FEES <br />RNGINEERINO <br />(Based on 52.59/L.F.) 52.59 X 1,332.00 L.F. = 3,449.88 <br />Sub•Total 863,527 77 <br />Administration 2.9997% 51,905.59 <br />Recording Fees 520000 <br />TOTAL 565,633.36 <br />25% County's Cost 516,408.34 <br />75% Property Owner's Assessment 549,225.02 <br />2% Tax Collector's Fee (75% Figure) 8984.50 <br />TOTAL ASSESSMENT 550,209. <br />Assessment <br />550.209.52 - 80.14873 <br />337,588.35 <br />9328CST3.,WK4 01/28/99 <br />