My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/24/2017 (4)
CBCC
>
Meetings
>
2010's
>
2017
>
01/24/2017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 12:30:28 PM
Creation date
4/13/2017 12:15:17 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/24/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br />EXHIBIT "A" <br />Continued <br />WORK ORDER NO.1 <br />Indian River County Public Works Department Professional Surveying and Mapping <br />Services Master Agreement for Annual Professional Surveying and Mapping Services - <br />Project No. 1605 <br />CAI Job. No. 16-603S <br />IR County Project No. 1605 <br />IR County Contract No. <br />IR County Work Order No.1 <br />Project Limits: <br />Approximately 2,700 feet +/- Survey of South 16th Manor and North 16th Manor Right of Ways. Services <br />performed and located within parts of the Westlake Estates Subdivision, Indian River County, Florida. <br />Topographic Route Survey performed within part of Section 1, Township 33 South, Range 38 East, Indian <br />River County, Florida. <br />Project Scope: <br />'The SURVEYOR shall provide Professional Land Surveying services to include the following: <br />1.) Establish horizontal control based on Florida State Plane Coordinate System, East Zone, NAD 83/2011 <br />and limited recovery of adjacent parcel corners; and establish vertical control network benchmarks along the <br />subject corridor based on North American Vertical Datum of 1988 not to exceed 600 feet. <br />2.) Field observe and record vertical ground spot elevations within project corridor, 10' outside of approximate <br />'right way and all specific points (road pavement, inverts and bottom of structures, swales, etc.) and changes in <br />contour within the subject corridor. <br />3.) Field observe and record all man-made above ground and natural features (over head electrical, valves, <br />mail boxes, drive ways, culverts, utility risers, utility boxes, etc. <br />4.) Observe and record the existing limits of vegetation, if any, within the project limits of the subject corridor. <br />5.) The route survey to be tied into the record plats of the Westlake Estates Subdivision. <br />Specific Notes: <br />Method of horizontal and vertical observations by G.P.S., RTK [accuracy: horizontal 8mm+1ppm (RMS), <br />vertical 15mm+1ppm (RMS)], North American Datum of 1983 / Adjustment of 2011, Florida State Plane <br />Coordinates (East Zone -901) and North American Vertical Datum of 1988. <br />Project Schedule: <br />Work will commence on the receipt of the notice to proceed or approved work authorization. <br />Completion and Final Deliverables: <br />Five (5) paper "hardcopy" signed and sealed Topographic Route Survey Certificates and an AutoCAD drawing <br />file with PDF formats will be provided. Field and office tasks will be completed in approximately thirty (30) days. <br />2 <br />P132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.