Mr. Himanshu H. Mehta, P.E. <br />28 December 2016 <br />Page 3 <br />Phase 2 — Meetings/Regulatory Interaction <br />Under this task, Geosyntec will prepare for, and attend a project meeting with FDEP, as requested <br />by IRC SWDD. It has been assumed that two Geosyntec personnel will attend the meeting, which <br />will'be held at the IRC SWDD office. A powerpoint presentation will be prepared for use during <br />the meeting. <br />Phase 3 — Iniection Activities <br />Under this task, Geosyntec will implement the proposed injection activities, as outlined in the <br />FDEP-approved RAPM Addendum No. 3 and detailed information provided to IRC SWDD via <br />email on 28 December 2016 regarding the proposed injection approach and refined treatment area. <br />These activities will include monitoring well installation, procurement of injection amendment and <br />drilling subcontractor and performance of the injection activities. It has been assumed that the <br />injection activities can be completed in five field days (one day for onsite field prep, three days for <br />monitoring well installation and injection activities, and one day for breakdown). IDW will be <br />containerized and staged on-site for proper disposal. <br />Underground Injection Control (UIC) monitoring is required after injecting remedial fluids into <br />the aquifer according to Chapter 62-528 of the Florida Administrative Code (F.A.C.). UIC <br />monitoring will be included with the semi-annual sampling events until criteria are met. <br />Performance monitoring of CVOCs and total organic carbon will continue to be included as part <br />of the semi-annual sampling events. Budget for UIC and performance monitoring will be <br />conducted concurrently with semi-annual groundwater monitoring at the Site as a cost -savings <br />measure. Budget has not been included herein for these activities at this time. <br />Phase 4 — Reporting <br />Implementation of RAPM Addendum No. 3 will be summarized in the semi-annual groundwater <br />monitoring report that follows completion of the implementation activities. A limited budget has <br />been included herein to incorporate a description of these activities and a summary of the results <br />into the currently authorized semi-annual groundwater monitoring reports. <br />SCHEDULE <br />Geosyntec will initiate project scheduling and implementation activities within two weeks of <br />receipt of notice to proceed from the County. The final field schedule will be based on <br />subcontractor availability and the delivery schedule for the injection materials. We anticipate that <br />the field activities will tentatively be conducted in February 2017. A description of the well <br />installation and dosing activities will be included in future semi-annual groundwater monitoring <br />report(s). <br />XR16044 - Gifford RAPM3 Imp <br />engineers I scientists I innovators <br />P176 <br />