My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/24/2017 (4)
CBCC
>
Meetings
>
2010's
>
2017
>
01/24/2017 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 12:30:28 PM
Creation date
4/13/2017 12:15:17 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/24/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XR16044.xlsx <br />Attachment A <br />BUDGET ESTIMATE <br />SOUTH GIFFORD ROAD LANDFILL <br />PHASE 1: Proiect Management <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />BUDGET <br />A. Professional. Services <br />a. Senior Principal <br />hr <br />$221 <br />2 <br />$442 <br />b. Pnucipal <br />hr <br />$197 <br />0 <br />$0 <br />c. Senior Project Geologist <br />hr <br />$184 <br />4 <br />$736 <br />d. Project Engineer <br />hr <br />$143 <br />12 <br />$1,716 <br />e. Engineer <br />hr <br />$124 <br />0 <br />$0 <br />f. Senior Staff Geologist <br />hr <br />$109 <br />0 <br />$0 <br />g. Staff Engineer <br />hr <br />$93 <br />0 <br />$0 <br />Subtotal Professional.Services <br />$2,894 <br />B'. Tech nical/Administrative Services <br />a. Site Manager/Construction Manager <br />hr <br />$105 <br />0 <br />$0 <br />b. Senior Engineering Technician <br />hr <br />$78 <br />0 <br />$0 <br />c. Designer/GIS <br />hr <br />$127 <br />0 <br />$0 <br />d. Drafter/CADD Operator <br />hr <br />$77 <br />0 <br />$0 <br />e. Technical/Administrative Assistant <br />hr <br />$87 <br />4 <br />$348 <br />f Technical Word Processor <br />hr <br />$89 <br />0 <br />$0 <br />g. Clencal <br />hr <br />$92 <br />0 <br />$0 <br />Subtotal Technical/Administrative Services <br />$348 <br />C. Reimbursables <br />a. Lodging <br />day <br />$89 <br />0 <br />$0 <br />b. Per Diem <br />day <br />$51 <br />0 <br />$0 <br />c. Communications Fee <br />3% labor <br />0.03 <br />3,242 <br />$97 <br />d. CADD Computer System <br />hr <br />$15 <br />0 <br />$0 <br />e. Vehicle Rental <br />day <br />$75 <br />0 <br />$0 <br />f 8.5"x11" Photocopies <br />each <br />$0.12 <br />0 <br />$0 <br />g. Airfare <br />each <br />$300 <br />0 <br />$0 <br />Subtotal Reimbursables <br />$97 <br />TOTAL ESTIMATED BUDGET: PHASE 1 <br />$3,339 <br />Geosyntec Consultants <br />P179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.