Laserfiche WebLink
Attachment A <br />BUDGET ESTIMATE <br />SOUTH GIFFORD ROAD LANDFILL <br />PHASE 4: Renortint! <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />BUDGET <br />A. Professional Services <br />a. Principal <br />$221 <br />$19567 <br />2 <br />$391 <br />b. Associate <br />$197 <br />$185.32 <br />0 <br />$0 <br />c. Senior Project Geologist <br />$184 <br />$163.07 <br />8 <br />$1,305 <br />d. Project Engineer <br />$143 <br />$129.12 <br />8 <br />$1,033 <br />e. Engineer <br />$124 <br />$112.49 <br />0 <br />$0 <br />f. Senior Staff Geologist <br />$109 <br />$100.16 <br />0 <br />$0 <br />g. Staff Engineer <br />$93 <br />$84.24 <br />0 <br />$0 <br />Subtotal <br />Professional <br />Services <br />$2,729 <br />B. Technical/Administrative Services <br />a. Site Manager/Construction Manager <br />hr <br />$105 <br />0 <br />$0 <br />b. Senior Engineering Technician <br />hr <br />$78 <br />0 <br />$0 <br />c. Designer/GIS <br />hr <br />$127 <br />4 <br />$508 <br />d. Drafter/CADD Operator <br />hr <br />$77 <br />0 <br />$0 <br />e. Technical/Administrative Assistant <br />hr <br />$87 <br />2 <br />$174 <br />f. Technical Word Processor <br />hr <br />$89 <br />0 <br />$0 <br />g. Clerical <br />hr <br />$92 <br />2 <br />$184 <br />,Subtotal Technical/Administrative <br />Services <br />$866 <br />C. Reimbursables <br />a. Lodging <br />day <br />$89 <br />0 <br />$0 <br />b. Per Diem <br />day <br />$51 <br />0 <br />$0 <br />c Communications Fee <br />3% labor <br />0.03 <br />$3,595 <br />$108 <br />d. CADD Computer System <br />hr <br />$15 <br />2 <br />$30 <br />e. Vehicle Rental <br />day <br />$75 <br />0 <br />$0 <br />f. 8.5"xl l" Photocopies <br />each <br />$0.12 <br />500 <br />$60 <br />g. CADD Photocopies <br />each <br />$3 <br />12 <br />$36 <br />Subtotal <br />Reimbursables <br />$234 <br />TOTAL ESTIMATED <br />BUDGET: <br />PHASE 4 <br />$3,829 <br />Geosyntec Consultants <br />P182 <br />