|
D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all
<br />additional or supplementary examinations, investigations, explorations, tests, studies, and data
<br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site
<br />which may affect cost, progress, or performance of the Work or which relate to any aspect of the
<br />means, methods, techniques, sequences, and procedures of construction to be employed by
<br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and
<br />procedures of construction, if any, expressly required by the Contract Documents to be employed
<br />by CONTRACTOR, and safety precautions and programs incident thereto.
<br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests,
<br />studies, or data are necessary for the performance of the Work at the Contract Price, within the
<br />Contract Times, and in accordance with the other terms and conditions of the Contract Documents.
<br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the
<br />Site that relates to the Work as indicated in the Contract Documents.
<br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br />observations obtained from visits to the Site, reports and drawings identified in the Contract
<br />Documents, and all additional examinations, investigations, explorations, tests, studies, and data
<br />with the Contract Documents.
<br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies
<br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof
<br />by OWNER is acceptable to CONTRACTOR.
<br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms
<br />and conditions for performance and furnishing of the Work.
<br />ARTICLES: CONTRACT DOCUMENTS
<br />8.01 Contents
<br />A. The Contract Documents consist of the following:
<br />1. This Agreement (pages 1 to 7 of 7, inclusive);
<br />2. Notice to Proceed
<br />3. Public Construction Bond (pages -„_ to __., inclusive);
<br />4. Certificate of Liability Insurance
<br />5. Irrigation System Material and Installation Specifications (pages 1 to 44, inclusive)
<br />6. Drawings consisting of a cover sheet and sheets numbered OVR, M1 to M2, EL1, EL2, D1. D2,
<br />with each sheet bearing the following general title: Sandridge Golf Course -Lakes Course;
<br />7. Addenda (numbers 1 to 3, inclusive);
<br />Page 4 of 7
<br />P118
<br />
|