Laserfiche WebLink
ATTACHMENT 2 <br />QUOTATION / ESTIMATE <br />BLUE Blue <br />GOOSE Goose <br />Construction QUOTE No: <br />Quote Date: January 6, 2017 <br />TO: Indian River County Utilities CONTACT: Steve. Bush <br />PHONE: 772-216-1873 <br />FAX : <br />EMAIL: <br />SCOPE OF WORK <br />ITEM <br />Qty <br />Unit Unit Price <br />Extension <br />1 <br />6" PVC WM <br />865 <br />LF <br />$6.00 <br />$5,190.00 <br />2 <br />6" Directional Bore <br />90 <br />LF <br />$38.85 <br />$3,496.50 <br />3 <br />2" PE Watermain <br />80 <br />LF <br />$4.80 <br />$384.00 <br />4 <br />2" Directional Bore (services) <br />160 <br />LF <br />$33.35 <br />$5,336.00 <br />5 <br />6" Bell Restraints <br />2 <br />Ea <br />$60.00 <br />$120.00 <br />6 <br />8" Gate Valve <br />1 <br />Ea <br />$160.00 <br />$160.00 <br />7 <br />Fire Hydrant Assembly <br />1 <br />Ea <br />$2,000.00 <br />$2,000.00 <br />8 <br />MJ Fittings <br />1 <br />Ton <br />$4,100.00 <br />$4,100.00 <br />9 <br />8X6 Tapping Sleeve & Valve <br />1 <br />Ea <br />$900.00 <br />$900.00 <br />10 <br />Single Short Water Service <br />1 <br />Ea <br />$300.00 <br />$300.00 <br />11 <br />1 Double Short Water Service <br />3 <br />Ea <br />$350.00 <br />$1,050.00 <br />12 <br />ISingle Long Water Service <br />4 <br />Ea <br />$425.00 <br />$1,700.00 <br />13 <br />1 Double Long Water Service <br />2 <br />Ea <br />$450.00 <br />$900.00 <br />14 <br />Pig Lines, Flush & Pressure Test <br />1035 <br />LF <br />$1.50 <br />$1,552.50 <br />15 <br />Pot Holes <br />15 <br />Ea <br />$250.00 <br />$3,750.00 <br />16 <br />Temporary Jumper Assembly <br />1 <br />Ea <br />$500.00 <br />$500.00 <br />17 <br />Bacti Samples <br />4 <br />Ea <br />$150.00 <br />$600.00 <br />18 <br />linstall Sample Points <br />4 <br />1 Ea <br />$275.00 <br />$1,100.00 <br />19 <br />1 Lawn Restoration <br />577 <br />Sy 1 <br />$2.25 <br />$1,298.25 <br />20 <br />Record Drawings <br />1 <br />LS 1 <br />$1,000.00 <br />$1,000.00 <br />SUB -TOTAL = <br />$35,437.25 <br />21 <br />Mobilization <br />1 <br />LS <br />$3,543.73 <br />$3,543.73 <br />Contingency <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />TOTAL = <br />480.9811 <br />P139 <br />