Laserfiche WebLink
remove 80% of the stormwater nutrients. Currently, 500 residents have only one viable option for a hurricane evacuation route from <br />their homes to access AIA and S.R. 510 out to 1-95 from the barrier island. During Hurricane Matthew this single route, Old Winter Beach <br />Road, was submerged under 18-24 inches leading up to, during, and for days following Hurricane Matthew. Though the Town has <br />attended meetings with Indian River County for the last S years to gain funding assistance to reconstruct the Old Winter Beach Road to <br />guarantee its residents safe evacuation passage prior to and after storms, they have received no aid. With a completed engineering <br />design and permits in hand, this funding would allow the Town to raise the road's elevation from 1 to 7 feet at its lowest point near the <br />Indian River Lagoon and 10 feet where it intersects AIA, as well as the installation of a stormwater treatment train that would remove <br />80% of all stormwater pollutants from entering the Lagoon. This train will retrofit six existing town -owned roadside catch basin inlets <br />within the Town's right-of-way by adding leaf -litter debris baskets, and a modified slot to hold a Polyacrylamide (PAM) Log (or Floc Log) <br />that will remove more than 85% of all nitrogen and phosphorus from stormwater prior to discharging into an existing roadside dry <br />retention Swale. By elevating the roadway and installing the stormwater treatment train, the Town will guarantee safe passage of its <br />residents while simultaneously removing harmful pollutants form the Indian River Lagoon. <br />12. Provide specific details on how funds will be spent. (Select all thatapply). <br />Spending Category <br />Choose YES <br />or NO <br />Description <br />Non -Recurring <br />(Total should equal 4d, Col. <br />Administrative Costs: <br />a. Executive Director/Project Head Salary and Benefits <br />NO <br />b. Other Salary and Benefits <br />NO <br />c. Expense/Equipment/Travel/Supplies/Other <br />NO <br />d. Consultants/Contracted Services/Study <br />NO <br />Operational Costs: <br />e. Salaries and Benefits <br />NO <br />f. Expenses/Equipment/Travel/Supplies/Other <br />NO <br />g. Consultants/Contracted Services/Study <br />NO <br />Fixed Capital Construction/Major Renovation: <br />h. Construction/Renovation/Land/Planning Engineering <br />YES <br />Eliminate barrier flooding on Old Winter <br />Beach Road, insure a safe hurricane <br />evacuation route for 500 residents, and <br />removed 80% of harmful stormwater <br />nutrients from entering the IR Lagoon. <br />$650,000 <br />I. TOTAL REQUESTED <br />12. <br />