My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/21/2017
CBCC
>
Meetings
>
2010's
>
2017
>
02/21/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:02:48 PM
Creation date
4/13/2017 12:40:52 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/21/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BYERS Indian River County Implementation <br />—h%_ <br />• All locations are accessible by truck or splicing trailer. <br />• IRC will coordinate any required access to easements or right-of-way that might be required. <br />• Byers splicing vendor will notify IRC in the case any existing splices are disturbed. <br />• Number of Locations <br />0 11 Underground Nandholes Splices <br />0 0 Aerial Splices — (We do not see Aerial splice closures requiring validation) <br />o I Traffic Cabinet Splice (It is not known if this is splice case or patch scenario in the <br />cabinet) <br />Phase 4 - Build Splice Connectivity in NexusWorx. <br />• No assumptions. <br />COST <br />The following are Byers lump sum or unit prices. All prices are based the number of expected units. <br />Phase — Unit Type — Cost — Scope <br />Phase I Data Migration — Lump Sum - $ 5,000 — Entire GIS dataset <br />Phase 2 OSPASP Field Inventory and NexusWorx Update — Lump Sum - $ 17,000 - Pilot Area <br />Phase 3 OSP Splice Verification UG Location - Per Location — Lump Sum $ 25,000- Pilot Area <br />Phase 4 Build Connectivity in NexusWorx — Lump Sum - $ 2,000 - Pilot Area <br />Adder — <br />Splicing Unit Prices — <br />Single Fusion Splice — Unit — $67.50 W X 100 :16,750 .0 O <br />12 Strand Buffer Single Fusion — Unit - $800 (8) x 5 z f 4,000.00 <br />(a) — This pricing is direct invoicing from the fiber splicing vendor to IRC and not through Byers. <br />6. TIMELINE <br />Byers' expects that we can produce our deliverables within 90 calendar days of a notice to proceed or PO <br />from the utility board for the services as outlined in this proposal. <br />Copyright © 2016- Byers Engineering Company, Atlanta GA - All rights reserved <br />P61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.