My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/21/2017
CBCC
>
Meetings
>
2010's
>
2017
>
02/21/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:02:48 PM
Creation date
4/13/2017 12:40:52 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/21/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as ,specifie <br />Documents. The Work is generally described arld)lows: <br />The Project involves the construction of a <br />covered patio for a total building area ofC3 <br />building will consist of a classroom, offici, <br />facilities. This work shall include thoe all of <br />Plumbing work as detailed in the p1a`an <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for � <br />part is generally <br />Name: <br />Bid N <br />213C <br />work, <br />hereinafter set forth, <br />in the Contract <br />f. classroomphd 900-s.f. <br />{sem <br />of the non-s)5rinkled <br />id male>female toilet <br />ectb�al, Mechanical and <br />may be the whole or only a <br />COUNTY SHOOTING RANGE HUNTER <br />E, SEBASTIAN, FLORIDA 32958 <br />3.01 The liitlian Rivr,Cou Public Works Department is hereinafter called the ENGINEER <br />and will act as 0WNbE ; representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the corn;pleto't of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 120"' calendar day after the <br />date when the Contract Times commence to run as provided in paragraph 2.03 of the <br />@BCL@18059934 <br />00520-2 <br />C:\Users\GRANIC-11AppData\LocallTemp\BCL Technologies\easyPDF 7k@BCL@18059934%@BCL@18059934.doc <br />P78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.