Laserfiche WebLink
6.05 Acceptance of Final Payment as Release. <br />A. The acceptance by the CONTRACTOR of final payment shall be and shall operate <br />as a release to the OWNER from all claims and all liability to the CONTRACTOR <br />other than claims in stated amounts as may be specifically excepted by the <br />CONTRACTOR for all things done or furnished in connection with the work <br />under this Contract and for every act and neglect of the OWNER and others <br />relating to or arising out of the work. Any payment, however, final or otherwise, <br />shall not release the CONTRACTOR or its sureties from any obligations under <br />the Contract Documents or the Public Construction Bond. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, ME <br />paragraph 6.20 (Indemnification) of the GeneralxConditions to <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter <br />following representations: <br />A. CONTRACTOR has examine <br />other related data identified in <br />B. CONTRACTOR has visited the S <br />general, local, and, �nditions <br />Work. <br />the <br />accordance with <br />action Contract. <br />the <br />Documents and the <br />iar with and is satisfied as to the <br />progress, and performance of the <br />C. CONTRAG OR is familia ``;uvIth argil s{s'ati'sfied as to all federal, state, and local Laws and <br />Yc, vf� <br />Regulations at may affect oos , progr6 nd performance of the Work. <br />D. CONTRACTOR. hd§%'( efully &&died all: (1) reports of explorations and tests of <br />sfibs rface cor l tions a N 'ontigu�bu's to the Site and all drawings of physical conditions <br />rn or relating to' ;ex stifig sa or subsurface structures at or contiguous to the Site <br />except Undergro P' Facilities) which have been identified in the Supplementary <br />Gord#ionssfprovd in paragraph 4.02 of the General Conditions and (2) reports and <br />°tN r <br />drawings oHazard us Environmental Condition, if any, at the Site which have been <br />identified in the <br />uppleientary Conditions as provided in paragraph 4.06 of the General <br />Conditions. 11 jf <br />E. CONTRACTOR."has obtained and carefully studied (or assumes responsibility for having <br />done so) all additional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities) <br />at or contiguous to the Site which may affect cost, progress, or performance of the Work <br />or which relate to any aspect of the means, methods, techniques, sequences, and <br />procedures of construction to be employed by CONTRACTOR, including applying the <br />specific means, methods, techniques, sequences, and procedures of construction, if any, <br />expressly required by the Contract Documents to be employed by CONTRACTOR, and <br />safety precautions and programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />@BCL@ 18059934 <br />00520-5 <br />C:\Users\GRANIC-1\NppData\Local\Temp\BCL TechnologiesleasyPDF T@BCL@180599341@BCL@18059934.doc <br />P81 <br />