My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/2017
CBCC
>
Meetings
>
2010's
>
2017
>
03/07/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 1:08:01 PM
Creation date
4/13/2017 12:51:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/07/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />1. The Project shall be designed and constructed in accordance with the latest edition of the <br />DEPARTMENT'S Standard Specifications for Road and Bridge Construction and <br />DEPARTMENT Design Standards and Manual of Uniform Traffic Control Devices = <br />("MUTCD"). The following guidelines shall apply as deemed appropriate by the <br />DEPARTMENT: the DEPARTMENT Structures Design Manual, AASHTO Guide - -_ <br />Specifications for the Design of Pedestrian Bridges, AASHTO LRFD Bridge Design <br />Specifications, the DEPARTMENT Plans Preparation Manual ("PPM") Manual for <br />Uniform Minimum Standards for Design, Construction and Maintenance for Streets and <br />Highways (the "Florida Green Book") and the DEPARTMENT Traffic Engineering _ <br />Manual. The COUNTY will be required to submit any construction plans required by the <br />DEPARTMENT for review and approval prior to any work being commenced. Should any <br />changes to the plans be required during construction of the Project, the COUNTY shall be <br />required to notify the DEPARTMENT of the changes and receive approval from the <br />DEPARTMENT prior to the changes being constructed. The COUNTY shall maintain the = _ <br />area of the project at all times and coordinate any work needs of the DEPARTMENT <br />during construction of the Project. <br />2. The COUNTY shall notify the DEPARTMENT a minimum of 48 hours before beginning <br />construction within DEPARTMENT right of way. The COUNTY shall notify the <br />DEPARTMENT should construction be suspended for more than 5 working days. The <br />DEPARTMENT contact person for construction is Daniel Hiden located at 3601 Oleander <br />Avenue, Fort Pierce, FL 34982-6594, Telephone number 772-288-5777, Email address: <br />daniel.hiden(Wdot.state.fl.us. <br />3. The COUNTY shall be responsible for monitoring construction operations and the <br />maintenance of traffic ("MOT") throughout the course of the project in accordance with <br />the latest edition of the DEPARTMENT Standard Specifications, section 102. The <br />COUNTY is responsible for the development of a MOT plan and making any changes to <br />that plan as necessary. The MOT plan shall be in accordance with the latest version of the <br />DEPARTMENT Design Standards, Index 600 series. Any MOT plan developed by the <br />COUNTY that deviates from the DEPARTMENT Design Standards must be signed and <br />sealed by a professional engineer. MOT plans will require approval by the DEPARTMENT <br />prior to implementation. <br />4. The COUNTY shall be responsible for locating all existing utilities, both aerial and <br />underground, and for ensuring that all utility locations be accurately documented on the <br />construction plans. All utility conflicts shall be fully resolved directly with the applicable <br />utility. <br />5. The COUNTY will be responsible for obtaining all permits that may be required by other <br />agencies or local governmental entities. <br />Page 15 <br />P122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.