Laserfiche WebLink
COUNTY and DEPARTMENT personnel. Upon completion of construction, the <br />COUNTY will be required to submit to the DEPARTMENT final as -built plans and an <br />engineering certification that construction was completed in .accordance to the plans. <br />Submittal of the final as -built plans shall include one complete set of the signed and sealed <br />plans on 11" X 17" plan sheets and an electronic copy prepared in Portable Document <br />Format (PDF). Prior to the termination of this Agreement, the COUNTY shall remove its <br />presence, including, but .not limited to, all of the COUNTY's property, machinery, and <br />equipment from DEPARTMENT right of way and shall restore those portions of <br />DEPARTMENT right of way disturbed or otherwise altered by the Project to substantially <br />the same condition that existed immediately prior to the commencement of the Project. <br />13. If the DEPARTMENT determines that the Project is not completed in accordance with the <br />provisions of this Agreement, the DEPARTMENT shall deliver written notification of such <br />to the COUNTY. The COUNTY shall have thirty (30) days from the date of receipt of the <br />DEPARTMENT'S written notice, or such other time as the COUNTY and the <br />DEPARTMENT mutually agree to in writing, to complete the Project and provide the <br />DEPARTMENT with written notice of the same (the "Notice of Completion"). If the <br />COUNTY fails to timely deliver the Notice of Completion, or if it is determined that the <br />Project is not properly completed after receipt of the Notice of Completion, the <br />DEPARTMENT, within its discretion may: 1) provide the COUNTY with written <br />authorization granting such additional time as the DEPARTMENT deems appropriate to <br />correct the deficiency(ies); or 2) correct the deficiency(ies) at the COUNTY's sole cost and <br />expense, without DEPARTMENT liability to the COUNTY for any resulting loss or <br />damage to property, including, but not limited to, machinery and equipment. If the <br />DEPARTMENT elects to correct the deficiency(ies), the DEPARTMENT shall provide <br />the COUNTY with an invoice for the costs incurred by the DEPARTMENT and the <br />COUNTY shall pay the invoice within thirty (30) days of the date of the invoice. <br />14. The COUNTY shall implement best management practices for erosion and pollution <br />control to prevent violation of state water quality standards. The COUNTY shall be <br />responsible for the correction of any erosion, shoaling, or water quality problems that result <br />from the construction of the Project. <br />15. Portable Traffic Monitoring Site (PTMS) or a Telemetry Traffic Monitoring Site (TTMS) <br />may exist within the vicinity of your proposed work. It is the responsibility of the <br />COUNTY to locate and avoid damage to these sites. If a PTMS or TTMS is encountered <br />during construction, the Planning and Environmental Management Office (PL&EM) must <br />be contacted immediately at 954-777-4601. <br />16. During construction, highest priority must be given to pedestrian safety. If permission is <br />granted to temporarily close a sidewalk, it should be done with the express condition that <br />an alternate route will be provided, and shall continuously maintain pedestrian features to <br />meet Americans Disability Act (ADA) standards. <br />Page 17 <br />P124 <br />